ELE00-04910
| Final | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | FAIL |
|
|
###-#### Three prong recep installed on ungrounded circuit in office 2/21/2001 8:50:26 AM
|
ELE01-00514
| Final | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PASS |
|
|
###-#### T/S U/G N Ok 2/21/2001 10:19:32 AM
|
ELE01-00514
| Temporary Service | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 336 On 2/21/2001 10:18:57 AM T/S U/G N Ok 2/21/2001 10:19:15 AM
|
ELE01-00269
| Electrical Rough-In | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PART |
|
|
conference Leon ###-#### R/I walls ok 2/21/2001 4:24:06 PM
|
ELE00-04817
| Electrical Rough-In | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 08:22:33. Contact: ###-####.
|
ELE01-00541
| Final | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | FAIL |
|
|
###-#### Hot tub bonding #8 solid and not to disconnect Recep within 10 ft calculate load for service split breaker not approved for panel had conf with Dan (contractor) 2/21/2001 4:53:26 PM
|