ELE01-00521
| Electrical Rough-In | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 10:50:01. Contact: ###-####. no access $42.00 reinspection fee 2/21/2001 9:08:35 AM
|
ELE00-03055
| Electrical Rough-In | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | NR |
|
|
###-#### call first David not ready needs to call in for final 2/21/2001 8:46:25 AM
|
ELE99-02531
| Electrical Rough-In | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PART |
|
|
###-#### ok cover ceiling only bathrm not ready, service not ready 2/21/2001 11:22:10 AM
|
ELE00-04011
| Final | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | FAIL |
|
|
ron ###-#### late pm corrections nec210-52(c)(1) kitchen sink bcc all underground wiring shall be inspected 2/21/2001 4:52:04 PM
|
ELE01-00001
| Final | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | FAIL |
|
|
###-#### corrections nec 210-8(a)(1) 210-52(c)(1) kitchen both insides of sink and counter next to ref. upstairs bath rooms not gfci protected 2/21/2001 2:22:00 PM
|
ELE01-00032
| Final | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | FAIL |
|
|
###-#### correction nec 210-52(c)(1) both sides of sink 2/21/2001 1:50:49 PM
|
ELE01-00521
| Electrical Rough-In | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 09:55:07. Contact: ###-####. ok cover 2/21/2001 2:50:05 PM
|