BLD01-00298
| BLD-Footing | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PASS |
|
|
FT INSP--MARK-- ###-####
|
BLD00-02026
| BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PART |
|
|
###-####: Ok to cover 2nd floor room and corridor. 2/21/2001 10:09:55 AM
|
BLD01-00363
| BLD-Foundation | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 13:17:13. Contact: .
|
MEC01-00462
| Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-03641
| BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 14:31:03. Contact: . c/n posted on site. 2/21/2001 11:05:23 AM
|
MEC01-00452
| Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 16:03:55. Contact: ###-####.
|
BLD01-00002
| BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 16:56:33. Contact: ###-####.Shear inspection--ok to side LOWER floor only--need to verify MSTC 40 straps before siding upper section. 2/21/2001 11:41:13 AM
|
MEC01-00488
| Rough-in | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-03410
| BLD-Energy code compliance | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-03560
| BLD-Framing/Rough-in | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PASS |
|
|
###-####. Ok to side. 2/21/2001 2:31:21 PM
|