PLM02-00404
| Water and/or Sewer | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | NR |
|
|
Scheduled by Inspector: 330 On 2/20/2002 1:49:44 PM
|
PLM02-00403
| Water and/or Sewer | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 330 On 2/20/2002 1:50:06 PM final ok when bedded in clean fill 2/21/2002 2:39:36 PM
|
PLM02-00412
| Water and/or Sewer | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
dave- ###-#### swr & water
|
PLM02-00413
| Final | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
###-#### PAUL
|
PLM98-00535
| Final | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PASS |
|
|
###-#### final ok with 1/2 bath, sink in garage and humidifers as future fixtures 2/21/2002 4:40:16 PM
|
PLM02-00021
| Final | 2/21/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 08:37:36. Contact: ###-####.
|
PLM02-00019
| Final | 2/21/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 08:38:28. Contact: ###-####.
|
PLM01-03880
| Groundwork | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PART |
|
|
###-#### STEVE PLEASE CALL 1ST wrong this was a partial rough in waste and vent only, went over water sizing, 1" shutoff valve and a short piece of 1' MAIN TO THE BRANCH SERVING THE WATER HEATER, THEN 3/4" EVERYWHERE ELSE 2/21/2002 5:13:49 PM
|