PLM01-03416
| Plumbing Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 14:51:15. Contact: ###-####.
|
PLM02-00402
| Sprinkler (Final) | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 2/20/2002 4:28:54 PM
|
PLM01-02192
| Plumbing Rough-in | 2/21/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PASS |
|
|
###-#### DEBBIE
|