MEC02-00504
| Final | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
|
BLD01-01491
| BLD-Footing | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 11:29:14. Contact: ###-####.
|
BLD00-03729
| BLD-Framing/Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PART |
|
|
bruce ###-#### second floor steel stud framing and firwe caulking on 4hr wall along a line 2/21/2002 4:17:40 PM
|
BLD02-00109
| BLD-Footing | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
###-#### DAVE
|
BLD01-03265
| BLD-Framing/Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PART |
|
|
###-#### jason sheer wall PARCEL HOLD TAKEN OFF FORNO FRAMING ALLOWED PER STEVE MUNROE shear ok to cover ext 2/21/2002 11:16:12 AM
|
BLD01-02901
| BLD-Framing/Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
STEVE ###-####
|
BLD01-02901
| BLD-Energy code compliance | 2/21/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 2/21/2002 10:37:14 AM
|
BLD02-00147
| BLD-Footing | 2/21/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PART |
|
|
###-#### MANA work in progress crew still laying out linessubgrade ok 2/21/2002 3:11:59 PM
|
MEC02-00009
| Rough-in | 2/21/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 10:01:01. Contact: .
|
BLD01-02764
| BLD-Framing/Rough-in | 2/21/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PASS |
|
|
###-#### LEROY ok to insulate and hang sheet rock on ceiling check seal package at insulation inspection 2/21/2002 2:06:50 PM
|
BLD01-02155
| BLD-Footing | 2/21/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 425 On 2/21/2002 12:26:14 PM inspected and sinded off by mti
|
BLD02-00193
| BLD-Energy code compliance | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 17:08:09. Contact: ###-####. need to insulate behind tub up stairs ok to cover the rest also need engineering on hold down left side of front window the rest of the shear is ok to cover 2/21/2002 3:04:46 PM
|
BLD02-00280
| BLD-Footing | 2/20/2002 | 2/21/2002 | 2/21/2002 12:00:00 AM | P | PASS |
|
|
ft insp- jack ###-#### cell
|