Inspections for the day of: Friday, February 21, 2003.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS02-00305 MIS-Aging Inspection2/21/20032/21/20032/21/2003 12:00:00 AM CANC
exp 5/21/03 2/24/2003 3:33:04 PM
BLD02-02718 BLD-Foundation2/20/20032/21/20032/21/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/20/2003 at 1:17:57 PM. Contact: ###-####.
BLD02-01067 BLD-Footing2/20/20032/21/20032/21/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/20/2003 at 1:20:32 PM. Contact: ###-####.
BLD03-00033 BLD-Foundation2/20/20032/21/20032/21/2003 12:00:00 AMAPART
###-#### Work in progress 2/21/2003 11:43:50 AM
BLD03-00149 BLD-Foundation2/20/20032/21/20032/21/2003 12:00:00 AMAPART
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie frost wall at front of house. 2/21/2003 11:05:01 AM
BLD03-00149 BLD-Foundation2/20/20032/21/20032/21/2003 12:00:00 AMAPART
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie frost wall at front of house. 2/21/2003 11:05:01 AM
BLD02-02707 BLD-Conference2/20/20032/21/20032/21/2003 12:00:00 AMAPART
next door neighbor is concerned about the height of house and set backs.. they broke her fence please check on it. *Site visit. * The house appears to have the required minimum 5 foot side yard set back and according to the permit, The house is to be constructed with a second floor. I see no violations a this site at this time. 2/21/2003 11:29:19 AM
BLD02-00489 BLD-Final2/20/20032/21/20032/21/2003 12:00:00 AMPPASS
###-####. Ok for a temporary, needs all signatures and a c./n completed. 2/21/2003 2:58:53 PM
BLD02-01499 BLD-Framing/Rough-in2/20/20032/21/20032/21/2003 12:00:00 AMPFAIL
randy or ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. I meet on site with Randy who will be the occupant, I went over several items with him in reguard to structural issues, there is not 1 hold down that has been installed right, I see by a "note" on the plans that interior shear will be used, there are no cross sections. Connections to the bottom sole plate in some areas will not be able to receive nailing, some areas need full length studs, Note it would appear that a large window has been added at the peak of the north end this is not shown on plan.The exterior wall framing has not been completed to receive the metal siding as the exterior wall framing was changed to smaller diminsion studs and there are areas which will need furing, These plans lack neccesary detailing. As is now there is only the north side of the schell on site, I have been informed by the person on site that there will also be interior changes. I told person on site this day that I would need to meet back on site with my suppervisor and framer also enginner , so as to have all parties present to go over the extensive corrections and or changes,that will need to be made to bring this structure into compliance at least at the structural exterior areas. NOTE: I have been informed that there will be interior changes made to the floor plan at this time I do not know as to the extent. 2/23/2003 10:01:35 AM
BLD02-02953 BLD-Framing/Rough-in2/20/20032/21/20032/21/2003 12:00:00 AMPFAIL
shear- ben ###-#### c/n posted. 2/21/2003 3:18:12 PM
BLD02-02473 BLD-Foundation2/20/20032/21/20032/21/2003 12:00:00 AMPPASS
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD02-02474 BLD-Foundation2/20/20032/21/20032/21/2003 12:00:00 AMPPASS
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD02-02125 BLD-Footing2/21/20032/21/20032/21/2003 12:00:00 AMPPASS
cortz; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie