ELE06-00610
| Rough-In Permanent Service | 2/21/2006 | 2/21/2006 | 2/21/2006 4:25:16 PM | P | PASS |
|
|
ron ###-#### ric ok, p/s u/g n ok
|
ELE05-04238
| ELE-Aging Inspection | 2/21/2006 | 2/21/2006 | 2/21/2006 4:18:46 PM | | DONE |
|
|
see final
|
ELE06-00604
| Electrical Rough-In | 2/21/2006 | 2/21/2006 | 2/21/2006 4:17:25 PM | P | CANC |
|
|
Stacy -- for hot tub; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong see final
|
ELE06-00607
| Rough-In Permanent Service | 2/21/2006 | 2/21/2006 | 2/21/2006 3:19:42 PM | P | FAIL |
|
|
Brandon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong called contr, left corr notice, 300.4(A) edge of hole shall be 1/14" from edge of framing member, 334.80 when more than 2 nm conductors pass thru hole to be fire-stopped, ampacity shall be adjusted per 310.15(B)(2)(a), 314.20 box shall be flush with combustible material, 334.30 nm cable shall be supported within 12" of box
|
ELE06-00232
| Electrical Rough-In | 2/20/2006 | 2/21/2006 | 2/21/2006 3:08:29 PM | P | NR |
|
|
This is for a wall inspection, call Ryan with any questions. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa met elec, nr
|
ELE06-00569
| Final | 2/16/2006 | 2/21/2006 | 2/21/2006 1:57:30 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Dana Moyer ok to final
|
ELE05-04605
| Final | 2/21/2006 | 2/21/2006 | 2/21/2006 1:16:33 PM | P | PASS |
|
|
Tom; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong called office to correct address, corrections made, signed occ card, ok to final
|
ELE06-00150
| Electrical Rough-In | 2/21/2006 | 2/21/2006 | 2/21/2006 12:55:24 PM | P | PASS |
|
|
ceiling insp jerimiah; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie outer offices and halls ok for ceiling tiles
|
ELE06-00584
| Temporary Service | 2/17/2006 | 2/21/2006 | 2/21/2006 9:54:00 AM | A | FAIL |
|
|
###-#### rick called contr, left message, left corr notice, 312.5 conductors entering enclosures shall have abrasion protection, 110.12(C) there shall be no broken parts
|
ELE06-00329
| Final | 2/20/2006 | 2/21/2006 | 2/21/2006 9:25:55 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: joe wheeler ok to final, signed occ card
|
ELE05-03599
| Final | 2/20/2006 | 2/21/2006 | 2/21/2006 8:38:34 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/20/2006 at 5:13:29 PM. Contact: ###-####. corr made, ok to final
|
ELE06-00592
| Permanent Service | 2/21/2006 | 2/21/2006 | 2/21/2006 8:15:59 AM | P | PASS |
|
|
please call first; Phone #: ###-#### Internet Inspection Request from: Todd Holbrook p/s n exst meter pak ok
|
ELE06-00592
| Electrical Rough-In | 2/21/2006 | 2/21/2006 | 2/21/2006 8:14:54 AM | A | PASS |
|
|
please call first; Phone #: ###-#### Internet Inspection Request from: Todd Holbrook walls only ok to cover
|
ELE05-04205
| Final | 2/21/2006 | 2/21/2006 | 2/21/2006 12:00:00 AM | A | PASS |
|
|
ok to final
|
ELE05-04234
| Final | 2/21/2006 | 2/21/2006 | 2/21/2006 12:00:00 AM | A | PASS |
|
|
looked at signs, ok to final
|
ELE06-00604
| Final | 2/21/2006 | 2/21/2006 | 2/21/2006 12:00:00 AM | P | PASS |
|
|
Stacy -- for hot tub; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong called contr to gnd downspout, ok to final
|
ELE05-04238
| Final | 2/21/2006 | 2/21/2006 | 2/21/2006 12:00:00 AM | P | PASS |
|
|
looked at sign, ok to final
|
ELE05-04233
| Final | 2/21/2006 | 2/21/2006 | 2/21/2006 12:00:00 AM | P | PASS |
|
|
looked at sign, ok to final
|