ELE07-03492
| Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 4:13:13 PM | P | CANC |
|
|
MORGAN UNDERGROUND Phone #: ###-#### Internet Inspection Request from: Sean DeLacy see conference
|
ELE07-03492
| Conference | 2/21/2008 | 2/21/2008 | 2/21/2008 3:40:51 PM | P | DONE |
|
|
MORGAN UNDERGROUND Phone #: ###-#### Internet Inspection Request from: Sean DeLacy talked about conduit spacing, pull box sizes, depth of conduit
|
ELE08-00429
| Conference | 2/21/2008 | 2/21/2008 | 2/21/2008 2:49:00 PM | P | DONE |
|
|
clyde Phone #: ###-#### talked about 1 service to building, grounding, clearances, getting building permit if all one building, addresses
|
ELE07-03784
| Final | 2/21/2008 | 2/21/2008 | 2/21/2008 1:29:44 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman called, left correction notice, NEC 314.23(C) boxes shall be securely mounted in a finished surface, 406.4 receptacles shall be securely fastened in place, 352.30(A) rnc at service shall be securely fastened within 3' of box,408.4 shall provide circuit directory for house panel, 422.31(B) shall provide disconnect for heater in #201, BCC all work shall be completed for final, i.e. air condioners shall be wired
|
ELE08-00421
| Electrical Rough-In | 2/21/2008 | 2/21/2008 | 2/21/2008 12:34:09 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Lynn Cable called contractor, ric ok
|
ELE08-00385
| Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 10:41:06 AM | A | PASS |
|
|
PLEASE CALL ###-#### to have Bryan meet you on site~ our shop is approximately 10 minutes from jobsite. Phone #: ###-#### Internet Inspection Request from: Bryan Atkins met contractor, ric ok , tub hatch to be min 16"x14"
|
ELE08-00381
| Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 10:10:03 AM | A | PASS |
|
|
jake Phone #: ###-#### ric ok
|
ELE08-00421
| Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 9:27:23 AM | A | NH |
|
|
Need rough in, Garage overhead door is unlocked. the house is occupied so if you could cordinate with the builder when you will be there I would appriciate it. His name and number is Ernie ###-####. Thanks Phone #: ###-#### Internet Inspection Request from: Lynn Cable called builder 2x, then contractor, told to call when available to let in, fee due
|
ELE08-00423
| Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 9:13:39 AM | A | PASS |
|
|
access through gate on north side, please close gate behind you, up back porch to door you will enter into kitchen and all work was done in that room Phone #: ###-#### Internet Inspection Request from: Charles Davis ok to cover kitchen area
|
ELE07-03784
| Final | 2/21/2008 | 2/21/2008 | 2/21/2008 9:13:00 AM | A | NH |
|
|
Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman called contractor, locked up, told to call for pm, fee due
|
ELE08-00087
| Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 9:00:22 AM | A | CANC |
|
|
Contact Mike (airport oversite) 30 minutes prior to arrival for escort to job site. Cabinet rough-in. Phone #: ###-#### Internet Inspection Request from: Kristopher Wilson request entered 2x, see ri
|
ELE08-00087
| Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 8:59:26 AM | A | PASS |
|
|
Contact Mike (airport oversite) 30 minutes prior to arrival for escort to job site. Cabinet rough-in. Phone #: ###-#### Internet Inspection Request from: Kristopher Wilson called, left message, counter area ok to cover
|
ELE08-00381
| Electrical Rough-In | 2/19/2008 | 2/21/2008 | 2/20/2008 8:34:29 AM | A | CANC |
|
|
Jake Phone #: ###-#### contractor called and asked to postpone , will call back in
|