Inspections for the day of: Thursday, February 21, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00030 INSP-Sprinkler Rough-in2/20/20082/21/20082/21/2008 4:21:57 PMPPASS
The sprinkler piping is ok to cover.
FIR07-00449 INSP-Sprinkler Rough-in/Hydro2/21/20082/21/20082/21/2008 4:04:01 PMPPASS
First floor hydro test passed.
FIR08-00057 INSP-Final Inspection2/20/20082/21/20082/21/2008 4:01:56 PMPPASS
Permit finaled
FIR08-00140 INSP-Supply line flush2/21/20082/21/20082/21/2008 2:47:28 PMPPASS
The underground supply line can be buried. The underground supply line flush passed.
FIR08-00065 INSP-Sprinkler Rough-in2/20/20082/21/20082/21/2008 12:26:17 PMAPASS
rough-in passed. piping can be covered.
FIR06-00174 INSP-Final Inspection2/20/20082/21/20082/21/2008 12:01:21 PMAPASS
Permit finaled. No work was done or required upon field verification.
FIR08-00015 INSP-Sprinkler Rough-in/Hydro2/20/20082/21/20082/21/2008 11:34:16 AMAPASS
The wet system hydro test passed.
FIR07-00262 INSP-Final Inspection2/20/20082/21/20082/21/2008 10:59:10 AMAFAIL
The property management company did not arrive to provide acces into the tenant space. No inspection performed. Will need to be rescheduled.
FIR07-00247 INSP-Final Inspection2/20/20082/21/20082/21/2008 10:58:12 AMAFAIL
The property management company did not arrive to provide acces into the tenant space. No inspection performed. Will need to be rescheduled.
FIR07-00578 INSP-Sprinkler Rough-in/Hydro2/20/20082/21/20082/21/2008 9:43:48 AMAPASS
See the city approved plans for the piping that passed rough-in inspection today.