ESC07-00819
| Random Inspection | 2/21/2008 | 2/21/2008 | 2/21/2008 3:50:10 PM | P | PASS |
|
|
Check up of project. They constructed trash bins that will be placed at the entry of the building. Also constructed a proper concrete washout for mortar and concrete.
|
ESC07-01512
| Random Inspection | 2/21/2008 | 2/21/2008 | 2/21/2008 2:58:11 PM | P | FAIL |
|
|
**NOTICE OF CORRECTION** No ECS Permit displayed at front of building. Left a message for Stephen R. (RP) and instructed him that this must be placed with the corect info at the front of lot. Will re-inspect on Tuesday 2/26/08 in the AM
|
ESC07-01512
| Site Preparation | 2/21/2008 | 2/21/2008 | 2/21/2008 2:36:13 PM | P | CANC |
|
|
|
ESC07-01279
| Random Inspection | 2/21/2008 | 2/21/2008 | 2/21/2008 2:04:34 PM | P | PART |
|
|
Verbal Notice of Correction Need to get a sediment barrier next to the creek are of lot. Due to slope greater than 2% a barrier is needed to protect the creek. Will re-inspect on Monday 2/25/08
CAS#460 ###-####
|
ESC07-01279
| Site Preparation | 2/21/2008 | 2/21/2008 | 2/21/2008 2:02:30 PM | P | CANC |
|
|
Not a site prep.
|
ESC07-00883
| Random Inspection | 2/21/2008 | 2/21/2008 | 2/21/2008 1:47:20 PM | P | PART |
|
|
Discussed with Ken Litzinger (RP) over Trash pick up and either suppling a contained box or bin for debris. Also clean up of access street in the project area of all debris and sediment. Before next concrete pour must have a washout area for clean out. Will re-inspect on Thursday 2/28/08 CAS#460 ###-####
|
ESC07-00904
| Site Preparation | 2/21/2008 | 2/21/2008 | 2/21/2008 11:50:17 AM | A | PASS |
|
|
Checked up on the entrance of project. Looking good. CAS#460 ###-####
|
ESC07-01153
| Site Preparation | 2/21/2008 | 2/21/2008 | 2/21/2008 11:11:01 AM | P | PART |
|
|
Explained that silt fence along Warm Springs Rd is not installed correctly and needs to be installed correctly. Also Washout area needs to be corrected. A pit needs to dug out and a barrier lining in the pit. Will re-inspect Monday 2/25/08. CAS#460 ###-####
|