Inspections for the day of: Thursday, February 21, 2013.
Number of inspections: 18
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-01155 General Inspection2/19/20132/19/2013   
GCM13-00032 GCM-Rough-in2/21/20132/21/20132/22/2013 11:44:02 AMPPASS
Kari ###-####
MEC13-00783 Rough-in2/21/20132/21/20132/21/2013 4:49:49 PMPPASS
lars Phone #: ###-####...need signed/stamped letter from engineer as the install doesn't match the plans for the terminations
MEC12-02819 Final2/21/20132/21/20132/21/2013 4:26:43 PMPPASS
House open. Erik is builders name. Balance report and duct test results at furnace in basement with access to basement from back door of house to furnace. Phone #: ###-#### >> Inspection requested via web by Russ Curtis
MEC13-00782 Rough-in2/20/20132/21/20132/21/2013 3:43:24 PMPPASS
The addition is open through the back door and the AC is around the back on the north side of the house. You can call when you are on your way and hopefully I can meet you over there. I will be available from 1:30 to 3:30. I selected rough in but believe it should be a rough in and final. Thank you John Phone #: ###-#### >> Inspection requested via web by John Eastman..r/i ok...no new gas..furnace existing..no manual J
MEC13-00689 Final2/21/20132/21/20132/21/2013 2:41:42 PMPPASS
Please call Doris before coming out to coordinate time to meet at property this afternoon. Thanks. Phone #: ###-#### >> Inspection requested via web by Max Schrieber...home owners removed doors into enclosure as they didn't want grilles in the doors
MEC13-00762 Rough-in2/21/20132/21/20132/21/2013 2:22:45 PMPPASS
russ - call 30 mins prior to meet Phone #: ###-####...r/i and 20lb gas ok...duct blaster ok
MEC13-00716 Final2/21/20132/21/20132/21/2013 1:53:38 PMPPASS
meet owner at 1:15
GCM13-00025 GCM-Final2/20/20132/21/20132/21/2013 1:36:10 PMPPASS
###-####
MEC13-00726 Final2/14/20132/21/20132/21/2013 1:17:56 PMANH
OWNER GISELA BURKE ###-#### Phone #: ###-#### >> Inspection requested via web by Shannon Wells...rescheduled with owner for fri pm
MIS12-00325 MEC-Final2/20/20132/21/20132/21/2013 10:17:06 AMAPASS
mei Phone #: ###-####....hood, grease duct, exhaust fan and gas line all cleaned...new approved gas flex connectors installed..equipment under hood sized for air-flow
MEC13-00742 Pressure Test2/15/20132/21/20132/21/2013 9:53:32 AMAPASS
Pressure test scheduled 2/21/13. Bill can be reaached at ###-#### if needed. Phone #: ###-#### >> Inspection requested via web by Echo Jackson...20lb gas ok
GCM13-00040 GCM-Rough In & Pressure Test2/20/20132/21/20132/21/2013 9:20:43 AMANH
###-####
Call in advance...she rescheduled for monday am
MEC13-00716 Final2/19/20132/21/20132/21/2013 9:11:10 AMANH
home owner said there will be workers on job for access...nobody was home to let me in
MEC13-00721 Pressure Test2/20/20132/21/20132/21/2013 8:51:31 AMAFAIL
Phone #: ###-#### >> Inspection requested via web by Debbie Marino...bad guage...change and re-call for p
MEC13-00721 Rough-in2/20/20132/21/20132/21/2013 8:50:31 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
MEC13-00721 Pressure Test2/20/20132/21/20132/20/2013 4:46:16 PMPCANC
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino
MEC13-00721 Rough-in2/20/20132/21/20132/20/2013 4:46:14 PMPCANC
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino