ELE17-00388
| Final | 2/21/2017 | 2/21/2017 | 2/21/2017 2:05:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bryan McLaughlin...
ok to final
|
ELE17-00415
| Temporary Service | 2/20/2017 | 2/21/2017 | 2/21/2017 1:44:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI...
t/s u/g n ok
|
ELE16-01860
| Final | 2/20/2017 | 2/21/2017 | 2/21/2017 1:22:40 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot....
ok to final
|
ELE16-03529
| Electrical Rough-In | 2/21/2017 | 2/21/2017 | 2/21/2017 12:42:02 PM | P | PASS |
|
|
Service Laterals U/G inspection Phone #: ###-#### Inspection requested via web by Bryan Atkins...
ok to cover
|
ELE17-00424
| Temporary Service | 2/21/2017 | 2/21/2017 | 2/21/2017 10:48:23 AM | A | PASS |
|
|
Want meter re-connected to run outlets under panel for temp power construction. Phone #: ###-#### Inspection requested via web by David Nelson...
reconnect of power to energize temporary outlets for construction...existing service located on house
|
ELE17-00396
| Electrical Rough-In | 2/17/2017 | 2/21/2017 | 2/21/2017 10:13:10 AM | A | PASS |
|
|
There is a lock box on the tree to the left of the front door, if job is not open. The code is 2017. Thanks Phone #: ###-#### Inspection requested via web by Barbara Szurgot...
ok to cover....new master bed and bathroom and east wall living rm 2 outlets were window removed...discussed with contractor utillity room wiring will need to be fixed and is aware...check at final...sd will be remote no access
|
ELE17-00057
| Final | 2/17/2017 | 2/21/2017 | 2/21/2017 9:21:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Lott....
ok to final
|
ELE17-00099
| Electrical Rough-In | 2/20/2017 | 2/21/2017 | 2/21/2017 9:05:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON...
ok to cover....office space...back storage units connected to this building will still need rough in inspection
|
ELE16-03455
| Final | 2/17/2017 | 2/21/2017 | 2/21/2017 8:35:02 AM | A | PASS |
|
|
Final Inspection for floor heat. Phone #: ###-#### Inspection requested via web by Darryn Coburn....
corrections made...ok to final
|