BLD16-03701
| BLD-Aging Inspection | 2/21/2017 | 2/21/2017 | 2/22/2017 4:20:53 PM | | PEND |
|
|
|
MIS16-00354
| MIS-Aging Inspection | 2/21/2017 | 2/21/2017 | 2/22/2017 8:31:48 AM | | DONE |
|
|
|
BLD16-03822
| BLD-Conference | 2/21/2017 | 2/21/2017 | 2/21/2017 6:50:43 PM | P | DEFR |
|
|
Chris Phone #: ###-####, out of time,, called and told them they could start sheet rocking ceiling
|
BLD15-01130
| BLD-Energy code compliance | 2/21/2017 | 2/21/2017 | 2/21/2017 6:47:20 PM | P | PASS |
|
|
2nd Floor Insulation Inspection Phone #: ###-#### Inspection requested via web by Barry Willoughby
|
BLD16-02305
| BLD-Footing | 2/21/2017 | 2/21/2017 | 2/21/2017 4:24:40 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, needs hillside approval
|
BLD16-03608
| BLD-Conference | 2/17/2017 | 2/21/2017 | 2/21/2017 4:23:52 PM | P | NH |
|
|
contractor working on site-Mark Momncarr called asked Candy to set up a conference
|
BLD16-03503
| BLD-Other | 2/17/2017 | 2/21/2017 | 2/21/2017 4:10:28 PM | A | PART |
|
|
Ron-party wall Phone #: ###-####,, garage level firewalls ok to stand
|
BLD17-00067
| BLD-Footing | 2/21/2017 | 2/21/2017 | 2/21/2017 4:08:14 PM | P | PART |
|
|
Greg-would like early pm Phone #: ###-####,, poured,, ok
|
BLD99-03212
| BLD-Final | 2/21/2017 | 2/21/2017 | 2/21/2017 4:05:39 PM | P | DONE |
|
|
Call to meet // Debra Phone #: ###-####// project was done prior,, maintenance for cable is maintained by owner,, spacing is 4",, verified smoke detector locations
|
BLD99-03212
| DOC - Permit Finaled | 2/21/2017 | 2/21/2017 | 2/21/2017 4:04:48 PM | P | PASS |
|
|
done
|
BLD00-00041
| BLD-Final | 2/21/2017 | 2/21/2017 | 2/21/2017 4:01:29 PM | P | DONE |
|
|
Call to meet // Debra Phone #: ###-####
|
BLD00-00041
| DOC - Permit Finaled | 2/21/2017 | 2/21/2017 | 2/21/2017 4:00:59 PM | P | PASS |
|
|
done
|
BLD16-03149
| BLD-Wall cover | 2/17/2017 | 2/21/2017 | 2/21/2017 3:57:08 PM | P | PART |
|
|
bob Phone #: ###-####,, nailing ok,, just need to verify straps on exterior
|
BLD16-00307
| BLD-Foundation | 2/21/2017 | 2/21/2017 | 2/21/2017 3:03:12 PM | P | PEND |
|
|
Rebar inspection for the walls south the elevator on the west side. Gridlines 35 to 39 on V.8. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski// pending special inspection report
|
BLD16-02796
| BLD-Conference | 2/21/2017 | 2/21/2017 | 2/21/2017 2:45:30 PM | P | PART |
|
|
Eric; Phone #: ###-####,, progress inspection on hold downs from new engineering,, need plan review ok,, will have engineer verify as built also
|
BLD16-04136
| BLD-Footing | 2/17/2017 | 2/21/2017 | 2/21/2017 2:21:48 PM | A | PART |
|
|
Brandon Phone #: ###-####,, front porch footings ok
|
BLD16-04137
| BLD-Footing | 2/17/2017 | 2/21/2017 | 2/21/2017 2:21:01 PM | A | PART |
|
|
Brandon Phone #: ###-####,, front porch footings ok
|
BLD16-02180
| BLD-Final | 2/19/2017 | 2/21/2017 | 2/21/2017 1:49:35 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Eric White,, life safety ok,, need to finish exterior
|
BLD16-03762
| BLD-Foundation | 2/17/2017 | 2/21/2017 | 2/21/2017 1:27:16 PM | A | NR |
|
|
Jack Phone #: ###-####,, needs hillside soils report 1st
|
BLD16-03513
| BLD-Framing/Rough-in | 2/17/2017 | 2/21/2017 | 2/21/2017 1:25:27 PM | A | PART |
|
|
Ron-party wall Phone #: ###-####,, party wall framing ok per new fix
|
BLD16-03501
| BLD-Framing/Rough-in | 2/17/2017 | 2/21/2017 | 2/21/2017 12:24:46 PM | A | PART |
|
|
Ron-party wall Phone #: ###-####,, party wall framing ok to cover between floors,, ok to insulate ,, need f/place permit and inspection..
|
BLD16-00105
| BLD-Final | 2/18/2017 | 2/21/2017 | 2/21/2017 11:27:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD16-00105
| DOC - Permit Finaled | 2/21/2017 | 2/21/2017 | 2/21/2017 11:26:28 AM | P | PASS |
|
|
c of o issued
|
BLD16-02796
| BLD-Conference | 2/17/2017 | 2/21/2017 | 2/21/2017 11:07:34 AM | A | DEFR |
|
|
Eric; Phone #: ###-####,, pm
|
BLD16-03600
| BLD-Footing | 2/17/2017 | 2/21/2017 | 2/21/2017 11:05:45 AM | A | FAIL |
|
|
Dave Phone #: ###-####,, needs hillside approval
|
BLD16-03250
| BLD-Framing/Rough-in | 2/17/2017 | 2/21/2017 | 2/21/2017 11:04:31 AM | A | PASS |
|
|
Dave Phone #: ###-####-late as possible,, roof frame ok
|
MIS17-00043
| BLD-Conference | 2/17/2017 | 2/21/2017 | 2/21/2017 11:03:47 AM | A | PEND |
|
|
verbal stop work order
|
BLD16-02417
| BLD-Energy code compliance | 2/17/2017 | 2/21/2017 | 2/21/2017 11:02:27 AM | A | PASS |
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue, foam inside foundation ok
|
BLD16-02923
| BLD-Final | 2/17/2017 | 2/21/2017 | 2/21/2017 11:01:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marty Pieroni
|
BLD16-02923
| DOC - Permit Finaled | 2/21/2017 | 2/21/2017 | 2/21/2017 11:01:28 AM | P | PASS |
|
|
c of o issued
|
BLD16-00686
| BLD-Final | 2/17/2017 | 2/21/2017 | 2/21/2017 11:01:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marty Pieroni
|
BLD16-00686
| DOC - Permit Finaled | 2/21/2017 | 2/21/2017 | 2/21/2017 11:00:31 AM | P | PASS |
|
|
c of o issued
|
BLD15-01130
| BLD-Wall cover | 2/20/2017 | 2/21/2017 | 2/21/2017 10:32:22 AM | A | PART |
|
|
2nd Floor Insulation Inspection Phone #: ###-#### Inspection requested via web by Barry Willoughby,, 2nd floor ok
|
BLD15-01117
| BLD-Framing/Rough-in | 2/20/2017 | 2/21/2017 | 2/21/2017 10:31:06 AM | A | PASS |
|
|
First floor Framing Inspection Phone #: ###-#### Inspection requested via web by Barry Willoughby,, drops ok
|