ELE18-00355
| Electrical Rough-In | 2/21/2018 | 2/21/2018 | 2/21/2018 2:32:23 PM | P | PASS |
|
|
Ceiling grid rough in ok cover
|
ELE18-00355
| Final | 2/21/2018 | 2/21/2018 | 2/21/2018 2:31:43 PM | P | PART |
|
|
This Should Be Ready By 100 I Left The Ceiling Ooen As Well Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett Products prepared off site. K-8 warmer/cooker 120 volt GFCI in place and K-30 panini grills 2 pole 20 amp only items used for cooking. 2 pole 30 amp for ece maker GFCI required as well.
210.8- GFCI devices shall not be located where not readily accessible. Data GFCI located above 6'7". Due to GE products not available in Boise area any longer 2-pole receptacles to be either GFCI protected or hardwire appliances with disconnecting means. TCO ok
|
ELE17-04234
| Final | 2/20/2018 | 2/21/2018 | 2/21/2018 1:38:49 PM | P | PASS |
|
|
Garage code 1001E Phone #: ###-#### Inspection requested via web by Alan Lusk Final ok
|
ELE17-04311
| Final | 2/20/2018 | 2/21/2018 | 2/21/2018 1:38:24 PM | P | PASS |
|
|
Garage code 1001E Phone #: ###-#### Inspection requested via web by Alan Lusk Final ok
|
ELE17-01967
| Final | 2/20/2018 | 2/21/2018 | 2/21/2018 12:28:49 PM | A | PASS |
|
|
Install 3 park signs.1 at corner of 9th and Front, 1 at corner of 10th and front,1 at entrance into garage on 10th street. Install 2 pay stations sign on North side. ALL PRIMARY POWER BY OTHERS Phone #: ###-#### Inspection requested via web by Ken Olsen Final ok
|
ELE17-01967
| Electrical Rough-In | 2/20/2018 | 2/21/2018 | 2/21/2018 12:28:23 PM | A | PASS |
|
|
Install 3 park signs.1 at corner of 9th and Front, 1 at corner of 10th and front,1 at entrance into garage on 10th street. Install 2 pay stations sign on North side. ALL PRIMARY POWER BY OTHERS Phone #: ###-#### Inspection requested via web by Ken Olsen Listing and disconnecting means confirmed. Final ok
|
ELE17-03834
| Final | 2/20/2018 | 2/21/2018 | 2/21/2018 10:52:57 AM | A | PASS |
|
|
Requesting Final Inspection for 1st floor. Randy Fox will be on site to assist , if needed. Phone #: ###-#### Inspection requested via web by Kurt Carlson Final ok
|
ELE17-01337
| Electrical Rough-In | 2/20/2018 | 2/21/2018 | 2/21/2018 10:05:01 AM | A | PASS |
|
|
We are requesting a wall rough-in inspection for the meeting room outside walls for tomorrow morning. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Exterior walls only of meeting room and conference room and bathroom wall rough in ok cover
|
ELE17-03671
| Final | 2/20/2018 | 2/21/2018 | 2/21/2018 9:33:02 AM | A | FAIL |
|
|
Code 2010 Phone #: ###-#### Inspection requested via web by danny perrine Garage door openers not installed yet lift door. 110.3- Devices shall be wired as per instructions. 2 receptacles reverse polarity left of fireplace. 300.15- All boxes shall have covers or canopies. Hook up oven, hood, m vanity lts. 422.30- A disconnecting means shall be provided for all permanently connected appliances. Oven, hood.
|
ELE17-04155
| Final | 2/20/2018 | 2/21/2018 | 2/21/2018 8:57:12 AM | A | PASS |
|
|
Garage code 1001E Phone #: ###-#### Inspection requested via web by Alan Lusk Final ok
|
ELE17-01563
| Final | 2/20/2018 | 2/21/2018 | 2/20/2018 2:55:35 PM | A | CANC |
|
|
Install 1 sign reading "Parking" and 1 sign reading "The Fowler" ,1 round park sign and 1 sidewalk kiosk with parking counter.. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### >> Inspection requested via web by Ken Olsen Inspection cancelled from web by: Ken Olsen
|
ELE17-01563
| Electrical Rough-In | 2/20/2018 | 2/21/2018 | 2/20/2018 2:55:33 PM | A | CANC |
|
|
Install 1 sign reading "Parking" and 1 sign reading "The Fowler" ,1 round park sign and 1 sidewalk kiosk with parking counter.. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### >> Inspection requested via web by Ken Olsen Inspection cancelled from web by: Ken Olsen
|