Inspections for the day of: Wednesday, February 21, 2018.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC17-02216 Conference2/21/20182/21/20182/21/2018 3:37:31 PMPCANC
9am tomorrow
MEC18-00609 Final2/20/20182/21/20182/21/2018 1:44:18 PMAFAIL
10 am

waterheater corrections

1) permit required for installing a water heater
2) provide a water heater pan
3) T&P is trapped
4) remove flex connector fron T&P

furnace corrections

1) gas flex is undersized
2) seal between the furnace and coil
3) secure furnace flue
4) change condenser flex to weather tight.
called contractor
MIS18-00060 MEC-Conference2/20/20182/21/20182/21/2018 12:40:05 PMAFAIL
Kristy-please call for access Phone #: ###-####
1) provide heat to apartment
2) providde verification of approved occupancy