Inspections for the day of: Wednesday, February 21, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-00098 FIRE-Final Inspection2/21/20182/21/20182/21/2018 2:52:05 PMPPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete for area of work.
FIR18-00042 INSP-Final Inspection2/21/20182/21/20182/21/2018 2:50:20 PMPPASS
Final fire sprinkler inspection for area of work complete.
FIR18-00084 INSP-Final Inspection2/20/20182/21/20182/21/2018 2:49:23 PMPPASS
Final fire alarm inspection for area of work complete.
FIR17-00706 INSP-Sprinkler Rough-in/Hydro2/21/20182/21/20182/21/2018 12:44:08 PMPDONE
Hydrostatic test for underground supply witnessed, no pressure loss observed at fire riser gauge.
BLD17-03115 FIRE-Conference2/20/20182/21/20182/21/2018 11:18:51 AMADONE
Fire conference complete, notated city approved drawings where half wall will be shortened in lenght, does not pose any problem for egress.
FIR17-00654 INSP-Final Inspection2/21/20182/21/20182/21/2018 10:47:12 AMPPASS
Final fire sprinkler inspection for area of work complete.
FIR18-00134 INSP-Final Inspection2/21/20182/21/20182/21/2018 10:29:51 AMPPASS
Final fire sprinkler inspection for area of work complete.
FIR18-00134 INSP-Sprinkler Rough-in2/21/20182/21/20182/21/2018 10:29:18 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover
BLD18-00256 FIRE-Final Inspection2/20/20182/21/20182/21/2018 8:46:02 AMAPASS
Racking has been lowered to below 8 foot, final life safety inspection complete.
FIR17-00462 INSP-Sprinkler Rough-in2/20/20182/21/20182/21/2018 8:26:56 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.