MEC19-00567
| Pressure Test | 2/20/2019 | 2/21/2019 | 2/21/2019 3:12:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino-20 lb gas test pass.
|
MEC19-00567
| Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 3:12:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino
|
MEC19-00769
| Pressure Test | 2/21/2019 | 2/21/2019 | 2/21/2019 2:40:44 PM | P | PASS |
|
|
Please call 1 hour prior to arrival. They are starting this job at 8AM, should be ready for pressure around 10AM. Call Kelly Buel ###-#### he is the lead tech Phone #: ###-#### Inspection requested via web by kelly Martin-20 lb gas test pass.
|
MEC19-00769
| DOC - Permit Finaled | 2/21/2019 | 2/21/2019 | 2/21/2019 2:40:19 PM | P | PASS |
|
|
|
MEC18-04702
| Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 2:25:18 PM | P | PART |
|
|
Please call Bryan, thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Area B duct seal ok. Need to fire caulk all ducts going thru all fire rated walls.
|
PLM18-03615
| Final | 2/20/2019 | 2/21/2019 | 2/21/2019 11:52:45 AM | A | FAIL |
|
|
call to schedule time with John @ ###-####. if you have any other questions please call Pat @ ###-#### or Stacia @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann-Need tempered water of 110 degree water or less to bidet.
|
PLM19-00702
| Plumbing Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 11:27:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
MEC18-05704
| Final | 2/19/2019 | 2/21/2019 | 2/21/2019 10:46:34 AM | A | FAIL |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek-No air balance report on site.
|
PLM18-01689
| Other | 2/21/2019 | 2/21/2019 | 2/21/2019 10:45:12 AM | A | FAIL |
|
|
Left correction notice. 1-Roof drains need to be installed by a plumbing contractor. 2-Roof drains require overflow drains or scuppers. 3-Roof drains are required to be tested. 4-Need specs on roof drains that are installed.5-Need to size roof drains per the 2017 ISPC.
|
MEC19-00769
| Pressure Test | 2/20/2019 | 2/21/2019 | 2/21/2019 10:09:31 AM | A | FAIL |
|
|
Please call 1 hour prior to arrival. They are starting this job at 8AM, should be ready for pressure around 10AM. Call Kelly Buel ###-#### he is the lead tech Phone #: ###-#### Inspection requested via web by kelly Martin-Gauge will not zero out.
|
MEC18-04750
| Final | 2/20/2019 | 2/21/2019 | 2/21/2019 10:00:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino
|
MEC19-00726
| Pressure Test | 2/20/2019 | 2/21/2019 | 2/21/2019 9:28:57 AM | A | PASS |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek-20 lb gas test pass.
|
MEC19-00726
| Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 9:28:33 AM | A | PASS |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek
|
PLM18-01605
| PLM-Aging Inspection | 2/21/2019 | 2/21/2019 | 2/21/2019 6:19:17 AM | | PART |
|
|
No calls
|
PLM18-01620
| PLM-Aging Inspection | 2/21/2019 | 2/21/2019 | 2/21/2019 6:18:27 AM | | PART |
|
|
|
PLM17-02456
| PLM-Aging Inspection | 2/21/2019 | 2/21/2019 | 2/21/2019 6:17:32 AM | | PASS |
|
|
|
PLM17-02456
| DOC - Permit Expired | 2/21/2019 | 2/21/2019 | 2/21/2019 6:17:23 AM | A | PASS |
|
|
|
PLM18-01619
| PLM-Aging Inspection | 2/21/2019 | 2/21/2019 | 2/21/2019 6:16:21 AM | | PART |
|
|
wip
|
PLM18-03615
| Final | 2/20/2019 | 2/21/2019 | 2/20/2019 2:39:47 PM | A | CANC |
|
|
if questions call Pat @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
|