ELE95-01183
| INSP - Final | 2/21/1996 | 2/22/1996 | 2/22/1996 12:00:00 AM | A | NH |
|
|
02/22/96 315 - NALC JF
|
ELE95-01709
| INSP - T/S and Final | 2/21/1996 | 2/22/1996 | 2/22/1996 12:00:00 AM | A | PASS |
|
|
02/22/96 315 - REINSPECTION 49&14 ok jf sur. posted NEC 200-6(A) U/G NEW
|
ELE96-00540
| INSP - (Pools) bonding | 2/21/1996 | 2/22/1996 | 2/22/1996 12:00:00 AM | A | PASS |
|
|
02/22/96 315 - 09&54 (pool bond) ok jf 1 pool
|
ELE96-00549
| INSP - Ele Rough-In/Perm Svc | 2/22/1996 | 2/22/1996 | 2/22/1996 12:00:00 AM | P | PASS |
|
|
02/22/96 315 - 11 ROOMS A/C 100 AMPS 09&53 ok jf 11rms 1a/c 200a u/g new
|
ELE96-00115
| INSP - Electrical Rough-In | 2/22/1996 | 2/22/1996 | 2/22/1996 12:00:00 AM | P | CANC |
|
|
02/22/96 315 - HE SAID THIS IS FOR THE TWO ROOMS will add to next mod. jf
|
ELE96-00399
| INSP - Electrical Rough-In | 2/21/1996 | 2/22/1996 | 2/22/1996 12:00:00 AM | P | PASS |
|
|
02/22/96 315 - READY AT 1:00 TODAY 09 ok jf
|