Inspections for the day of: Tuesday, February 22, 2000.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00138 BLD-Framing/Rough-in2/18/20002/22/20002/22/2000 12:00:00 AMAPART
tony-- ###-#### basement walls Partial basement wall inspection. 2/23/00 1:55:14 PM
MIS00-00021 BLD-Conference2/18/20002/22/20002/22/2000 12:00:00 AMAPART
Illegal conversion of utility building to dwelling unit. They need to start process with planing/zoning.Refered to code enforcement.
BLD00-00333 BLD-Footing2/18/20002/22/20002/22/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/18/2000 at 17:27:59. Contact: ###-####. No plans at the site, work appears ok. 2/23/00 1:55:29 PM
BLD00-00368 BLD-Footing2/21/20002/22/20002/22/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/21/2000 at 14:12:19. Contact: ###-####. Appears ok no plans. 2/23/00 1:55:49 PM
BLD00-00306 BLD-Foundation2/21/20002/22/20002/22/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/21/2000 at 15:27:35. Contact: ###-####. Needs (2) #4 bars top and bottom, called contractor. 2/23/00 1:55:04 PM
MEC00-00558 Final2/18/20002/22/20002/22/2000 12:00:00 AMAFAIL
rex --###-#### home or work ###-#### --for homeowner
BLD99-03386 BLD-Energy code compliance2/18/20002/22/20002/22/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/18/2000 at 11:30:39. Contact: ###-####.
BLD99-03161 BLD-Framing/Rough-in2/18/20002/22/20002/22/2000 12:00:00 AMAPASS
###-#### Sheer nailing ok. 2/23/00 1:55:37 PM
BLD99-02579 BLD-Final2/18/20002/22/20002/22/2000 12:00:00 AMPFAIL
travis ###-#### fn Handrails not in compliance. 2/23/00 2:06:01 PM
BLD00-00213 BLD-Footing2/22/20002/22/20002/22/2000 12:00:00 AMPPASS
Ed ###-####
BLD00-00052 BLD-Framing/Rough-in2/22/20002/22/20002/22/2000 12:00:00 AMPPASS
jeff ###-#### shear wall insp
BLD00-00073 BLD-Framing/Rough-in2/22/20002/22/20002/22/2000 12:00:00 AMPFAIL
###-#### Corrections not done. 2/23/00 2:06:22 PM
BLD00-00223 BLD-Final2/22/20002/22/20002/22/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/22/2000 at 09:22:01. Contact: .
BLD00-00316 BLD-Footing2/22/20002/22/20002/22/2000 12:00:00 AMPCANC
Wes ###-#### Trans to 408 2/23/00 2:05:37 PM
BLD99-02447 BLD-Framing/Rough-in2/22/20002/22/20002/22/2000 12:00:00 AMPFAIL
Kristen, ###-#### Still has corrections, ok to insulate 2/23/00 2:05:48 PM
MIS00-00022 BLD-Conference2/22/20002/22/20002/22/2000 12:00:00 AMPPART
Needs to address all items on check list given to person at site, bond required of 20,000.