BLD00-03718
| BLD-Framing/Rough-in | 2/21/2001 | 2/22/2001 | 2/22/2001 12:00:00 AM | A | PASS |
|
|
###-#### above ceiling ok resubmital for deleation of pass through counter on plan archived to city set of plans revision. 2/22/2001 10:36:24 AM
|
BLD00-01261
| BLD-Conference | 2/21/2001 | 2/22/2001 | 2/22/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 15:49:02. Contact: ###-####.
|
BLD00-03027
| BLD-Final | 2/16/2001 | 2/22/2001 | 2/22/2001 12:00:00 AM | A | PART |
|
|
###-#### bldg. side ok for perm pending all other sign offs. 2/22/2001 9:37:51 AM
|
BLD00-01563
| BLD-Concrete | 2/19/2001 | 2/22/2001 | 2/22/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 07:09:24. Contact: ###-####. placed with special insp. pending report. 2/23/2001 10:52:15 AM
|
MEC00-02672
| Pressure Test | 2/22/2001 | 2/22/2001 | 2/22/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 09:23:18. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/22/2001 at 09:30:58.
|
BLD00-03486
| BLD-Final | 2/22/2001 | 2/22/2001 | 2/22/2001 12:00:00 AM | P | FAIL |
|
|
Greg Adams 99710 page him door hardware and floor pin. 2/23/2001 10:50:03 AM
|
BLD00-00071
| BLD-Final | 2/22/2001 | 2/22/2001 | 2/22/2001 12:00:00 AM | P | PASS |
|
|
greg adams 99701 page him
|
BLD00-02219
| BLD-Foundation | 2/22/2001 | 2/22/2001 | 2/22/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:07:32. Contact: ###-####. wall 2/22/2001 2:49:02 PM
|