Inspections for the day of: Thursday, February 22, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03391 BLD-Wall cover2/20/20012/22/20012/22/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/20/2001 at 12:59:47. Contact: ###-####.
ok to cover 2/22/2001 8:45:10 AM
BLD00-03390 BLD-Wall cover2/20/20012/22/20012/22/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/20/2001 at 13:01:28. Contact: ###-####.
ok to cover 2/22/2001 8:43:34 AM
BLD01-00081 BLD-Other2/21/20012/22/20012/22/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/21/2001 at 13:28:00. Contact: ###-####.
ext. shear ok w/ verbal corrections 2/22/2001 9:49:08 AM
BLD00-01487 BLD-Framing/Rough-in2/22/20012/22/20012/22/2001 12:00:00 AMPPART
chris ###-####
c/ n posted, ok to insulate unaffected areas 2/22/2001 1:03:03 PM
BLD00-01488 BLD-Framing/Rough-in2/22/20012/22/20012/22/2001 12:00:00 AMPPART
chris ###-####
c/n posted, ok to insulate unaffected areas 2/22/2001 1:03:45 PM
BLD01-00235 BLD-Foundation2/22/20012/22/20012/22/2001 12:00:00 AMPPART
###-####
wip, ok w/ verbal corrections 2/22/2001 2:08:38 PM
BLD00-01175 BLD-Final2/22/20012/22/20012/22/2001 12:00:00 AMPPASS
###-#### rob fn occ
c of c # 20307 issued, c/n ok 2/22/2001 3:14:36 PM
BLD01-00195 BLD-Footing2/22/20012/22/20012/22/2001 12:00:00 AMPPART
ready at 1 ###-####
verbal corrections on grade of ftgs and point loads, wip, conf. on ceiling hgts 2/22/2001 2:11:09 PM