Inspections for the day of: Friday, February 22, 2002.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00343 Groundwork2/21/20022/22/20022/22/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/21/2002 at 15:58:21. Contact: ###-####. 3 rd stubs north main level and a 4" sewer extention east to west center into ceiling of di room... also retest failed on dlb cont from chem storage rooms, interior pipoing shattered 48" from south end, repair pending 2/22/2002 11:35:14 AM
PLM01-03602 Final2/21/20022/22/20022/22/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/21/2002 at 17:00:48. Contact: ###-####. airgap t&p drain in basement, traps are to be the same size as the trap arm serving them. 2/22/2002 2:16:39 PM
PLM02-00392 Water and/or Sewer2/22/20022/22/20022/22/2002 12:00:00 AMAPART
Added by Inspector: 330 On 2/22/2002 11:56:36 AM sewer test ok covered under foundation but apears to be 4" to within the building