FIR06-00495
| FIR-Aging Inspection | 2/22/2007 | 2/22/2007 | 2/23/2007 6:42:52 PM | | DONE |
|
|
Project is still under construction.
|
FIR07-00050
| INSP-Sprinkler Rough-in/Hydro | 2/21/2007 | 2/22/2007 | 2/22/2007 4:17:07 PM | P | DEFR |
|
|
Inspection rescheduled per discussion with contractor.
|
FIR06-00880
| INSP-Final Inspection | 2/21/2007 | 2/22/2007 | 2/22/2007 4:04:00 PM | A | NH |
|
|
Not available.
|
FIR07-00078
| INSP-Sprinkler Rough-in | 2/21/2007 | 2/22/2007 | 2/22/2007 3:36:11 PM | A | FAIL |
|
|
Need to provide approved plans reflecting actual installation including major changes to pipe sizing and routing in the basement as well as added heads in the mech. room and 1st floor den.
|
FIR06-00476
| INSP-Final Inspection | 2/21/2007 | 2/22/2007 | 2/22/2007 3:32:46 PM | P | FAIL |
|
|
The outside bell failed to function upon waterflow. UG flush completed okay.
|
BLD06-00879
| BLD-Other | 2/21/2007 | 2/22/2007 | 2/22/2007 2:24:19 PM | A | PASS |
|
|
Shell and core life safety is satisfactory, inspection passed. Noted door hardware at three locations in the basement to be changed prior to tenant occupancy approval.
|
FIR07-00043
| INSP-Final Inspection | 2/21/2007 | 2/22/2007 | 2/22/2007 2:21:47 PM | A | PASS |
|
|
Fire alarm work passed inspection, permit finaled.
|
FIR06-00890
| INSP-Final Inspection | 2/21/2007 | 2/22/2007 | 2/22/2007 2:20:23 PM | A | PASS |
|
|
Fire sprinkler inspection passed, permit finaled.
|
FIR06-00523
| INSP-Conference | 2/21/2007 | 2/22/2007 | 2/22/2007 12:50:48 PM | A | DEFR |
|
|
To be completed 2/23.
|
FIR06-00504
| INSP-Sprinkler Rough-in | 2/21/2007 | 2/22/2007 | 2/22/2007 12:27:51 PM | A | CANC |
|
|
This is an overhead rough in for the 3rd and 4th floors. Contact is Jonathon @###-####. Thank You! Phone #: ###-#### Cancel inspection per phone call from contractor.
|