Inspections for the day of: Thursday, February 22, 2007.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-00582 Electrical Rough-In2/22/20072/22/20072/22/2007 2:52:42 PMPNR
john; Phone #: ###-####8 Internet Inspection Request from: Victoria Beall job not ready they to call for inspection when completed
ELE07-00303 Final2/22/20072/22/20072/22/2007 2:03:11 PMPNR
Any questions, please call Greg at number listed. Phone #: ###-#### x0000 called need to meet with electrian to see the that was done
ELE07-00194 Electrical Rough-In2/22/20072/22/20072/22/2007 1:35:46 PMPPASS
Scheduled by a contractor via Hello! on 2/22/2007 at 8:32:27 AM. Contact: ###-####. ok cover ceiling only this phase
ELE07-00476 Electrical Rough-In2/22/20072/22/20072/22/2007 1:03:07 PMPPASS
adam; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok cover ri by 370 2/21/07 1st floor
ELE06-02468 Electrical Rough-In2/21/20072/22/20072/22/2007 12:37:08 PMPCANC
contact: John Stebly - underground inspection Phone #: ###-#### t/w john this inspection is for street lighting. told him to call public works
ELE06-04071 Final2/22/20072/22/20072/22/2007 10:16:48 AMAPASS
ok final note we are not doing elevator inspections
ELE07-00153 Final2/21/20072/22/20072/22/2007 9:48:03 AMANR
PLEASE INSPECT AND FINAL THIS GARAGE. THANKS Phone #: ###-#### x0000 contractor called in the wrong job for inspection
ELE06-04063 Electrical Rough-In2/21/20072/22/20072/22/2007 9:26:12 AMAPASS
I''m scheduling this inspection for John Davis. He is on vacation and will be back 2/22. This is for bldg. 36, area 7. We need walls inspected prior to cover. Phone #: ###-#### ok cover walls only
ELE07-00412 Final2/20/20072/22/20072/22/2007 9:25:28 AMAPASS
Mike, This is a tool in fab 1A. SUP05 Phone #: ###-#### ok final
ELE07-00299 Final2/20/20072/22/20072/22/2007 9:24:43 AMAPASS
Mike, Please final this. It is a duplicate permit. Thanks. SUP05 Phone #: ###-#### ok final
ELE06-02253 Final2/20/20072/22/20072/22/2007 9:23:58 AMAPASS
Mike, This is a tool in Fab 1A. SUP05 Phone #: ###-#### ok final
ELE06-04006 Electrical Rough-In2/19/20072/22/20072/22/2007 9:23:23 AMAPASS
This is a break room remodel in building 80. We need the walls inspected before they can be covered. This is for John Davis who is on vacation and will be back on 2/22. Phone #: ###-#### ok cover walls only
ELE07-00595 Electrical Rough-In2/21/20072/22/20072/22/2007 9:22:39 AMAPASS
supervisor 02, rkpeterson, Please contact Mic Fulkerson ###-#### for walk thru. this is rough in for concrete footing, we are putting in u-fer ground to be looked at. Phone #: ###-#### ok cover u=fer ground