Inspections for the day of: Thursday, February 22, 2007.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-03292 DOC - Permit Finaled2/22/20072/22/20072/22/2007 4:10:53 PMPPASS
BLD06-03250 DOC - Permit Finaled2/22/20072/22/20072/22/2007 4:10:25 PMPPASS
MIS07-00001 BLD-Final2/20/20072/22/20072/22/2007 4:09:50 PMPPASS
###-#### david. final ok.
BLD06-02538 BLD-Final2/22/20072/22/20072/22/2007 3:57:10 PMPPASS
duane - contact for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD06-02538 DOC - Permit Finaled2/22/20072/22/20072/22/2007 3:57:03 PMPPASS
BLD06-03413 BLD-Other2/21/20072/22/20072/22/2007 3:09:22 PMPNR
Scheduled by a contractor via Hello! on 2/21/2007 at 11:52:46 AM. Contact: ###-####. shear nail insp. not ready. wip. Contractor to reschedule for tommorrow.
BLD06-02638 BLD-Final2/21/20072/22/20072/22/2007 2:46:30 PMPNR
Scheduled by a contractor via Hello! on 2/21/2007 at 12:53:04 PM. Contact: ###-####. Called and spoke with Collin (gen contr) and noted to him that he still needed otrher trades finaled prior to bldg. final.
BLD06-00909 BLD-Footing2/22/20072/22/20072/22/2007 2:38:54 PMPPART
ian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall.wip
BLD06-00920 BLD-Footing2/22/20072/22/20072/22/2007 2:30:56 PMPPASS
ian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD06-00919 BLD-Footing2/22/20072/22/20072/22/2007 2:05:16 PMPPASS
ian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD06-00908 BLD-Foundation2/22/20072/22/20072/22/2007 1:49:03 PMPPASS
ian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD06-03325 BLD-Aging Inspection2/22/20072/22/20072/22/2007 11:25:55 AM NR
MIS06-00133 DOC - Permit Finaled2/22/20072/22/20072/22/2007 11:22:19 AMACANC
As per tenant, they have not decided to occupy this space due to subleasing issues.
BLD05-01452 BLD-Final2/21/20072/22/20072/22/2007 11:18:55 AMANR
john; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. called contractor and noted to him that he needs life/safety and also a firw alarm final. Also could not confirm finals on elec and plumbing permits.. Also contacted Troy C. and gave him heads up on project.
BLD07-00019 BLD-Foundation2/21/20072/22/20072/22/2007 10:39:55 AMAPASS
Scheduled by a contractor via Hello! on 2/21/2007 at 4:42:45 PM. Contact: ###-####.
BLD06-01178 BLD-Foundation2/21/20072/22/20072/22/2007 10:20:47 AMAPASS
dave; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD06-02294 BLD-Framing/Rough-in2/21/20072/22/20072/22/2007 10:01:47 AMAPART
zane; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Needs to complete air seal package and provide truss engineering. Cobtractor to contact framer regarding cantilever and second floor issues. Did note that a lay down parapet was installed as per plan and noted that attic vents penetrated laydown parapet. Permit notes conts. to meet duplex standrads only, therefore penetrations are ok.
BLD06-00712 BLD-Footing2/21/20072/22/20072/22/2007 9:17:00 AMAPART
santos ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. wip. Needs to tie vert. reinf.
BLD06-03055 BLD-Final2/21/20072/22/20072/22/2007 8:57:37 AMAPASS
Phone #: ###-####
BLD06-03055 DOC - Permit Finaled2/22/20072/22/20072/22/2007 8:57:28 AMPPASS