ELE09-02348
| Final | 2/22/2010 | 2/22/2010 | 2/22/2010 4:54:59 PM | P | PART |
|
|
eric Phone #: ###-#### called 414, will reschedule tomorrow for info on plug connected equipment and labelling
|
ESC09-00750
| General Inspection | 2/22/2010 | 2/22/2010 | 2/22/2010 3:53:57 PM | P | PASS |
|
|
looked ok
|
ELE10-00266
| Final | 2/22/2010 | 2/22/2010 | 2/22/2010 3:49:13 PM | P | NH |
|
|
front door is ulocked. inpsect floor heat. Inspection requested from web by: Brandon Blackham Phone #: ###-#### called several times, left message, policy is that we don't enter occupied homes without escort, either owner or contractor, left card, no esc this project
|
ELE10-00215
| Electrical Rough-In | 2/22/2010 | 2/22/2010 | 2/22/2010 3:27:42 PM | P | PASS |
|
|
Chris- garage Phone #: ###-#### ric ok garage only
|
ELE10-00324
| Temporary Service | 2/22/2010 | 2/22/2010 | 2/22/2010 2:15:35 PM | P | PASS |
|
|
Inspection requested from web by: TOM BICANDI Phone #: ###-#### corrections made, t/s u/g n ok, no esc this project
|
ELE10-00325
| Temporary Service | 2/22/2010 | 2/22/2010 | 2/22/2010 1:49:11 PM | P | PASS |
|
|
Inspection requested from web by: TOM BICANDI Phone #: ###-#### corrections made, t/s u/g n ok, no esc this project
|
ELE09-02446
| Permanent Service | 2/22/2010 | 2/22/2010 | 2/22/2010 12:59:25 PM | P | PASS |
|
|
Leo Phone #: ###-#### p/s o/h rec ok, 4 meters required, no esc this project
|
ELE10-00312
| Final | 2/19/2010 | 2/22/2010 | 2/22/2010 10:15:40 AM | A | PASS |
|
|
richard - please call 1/2 hr prior Phone #: ###-#### ok to final, no esc this project
|
ELE10-00312
| Electrical Rough-In | 2/22/2010 | 2/22/2010 | 2/22/2010 10:15:21 AM | A | PASS |
|
|
richard - please call 1/2 hr prior Phone #: ###-#### ric ok, no esc this project
|
ELE10-00108
| Electrical Rough-In | 2/19/2010 | 2/22/2010 | 2/22/2010 9:44:33 AM | A | PASS |
|
|
Calvin Phone #: ###-#### ok to cover laundry room, no esc this project
|
ELE10-00325
| Temporary Service | 2/19/2010 | 2/22/2010 | 2/22/2010 9:21:53 AM | A | FAIL |
|
|
Inspection requested from web by: TOM BICANDI Phone #: ###-#### called, left correction notice, NEC 250.24 grounding electrode conductor shall be connected to grounded service conductor, 406.8(B) 15 and 20a receptacles shall be listed weather resistant type, BCC address shall be posted, job id sticker shall be posted, NOTE corrections shall be made within 5 working days or further action will be taken, no esc this project
|
ELE10-00324
| Temporary Service | 2/19/2010 | 2/22/2010 | 2/22/2010 9:21:27 AM | A | FAIL |
|
|
Inspection requested from web by: TOM BICANDI Phone #: ###-#### called, left correction notice, NEC 406.8(B) 15 and 20a receptacles shall be listed weather resistant type, BCC address shall be posted, job id sticker shall be posted, NOTE corrections shall be made within 5 working days or further action will be taken, no esc this project
|
ELE10-00266
| Electrical Rough-In | 2/22/2010 | 2/22/2010 | 2/22/2010 9:21:02 AM | A | NR |
|
|
Inspecting floor heat. Inspection requested from web by: Brandon Blackham Phone #: ###-#### contractor on site, not even ready, will call back in, fee due, no esc this project
|
ELE10-00325
| Temporary Service | 2/19/2010 | 2/22/2010 | 2/22/2010 8:38:19 AM | A | CANC |
|
|
Inspection requested from web by: TOM BICANDI Phone #: ###-#### duplicate request
|