ESC09-00812
| General Inspection | 2/22/2010 | 2/22/2010 | 2/22/2010 2:20:07 PM | P | FAIL |
|
|
Dewatering is not occurring due to the fact that the contractor had shut down the pump to repair the liner. Recommended that a 20 mil liner would be best to use instead of 6 mil. It remains the responsibility of the contractor and Parks for erosion controls in place which will reduce erosion to the MEP. Will follow up.
|