BLD10-01304
| BLD-Aging Inspection | 2/22/2011 | 2/22/2011 | 2/22/2011 4:55:32 PM | | PASS |
|
|
Deck is completed. Will have homeowner call in for final.
|
BLD10-02873
| BLD-Final | 2/22/2011 | 2/22/2011 | 2/22/2011 4:54:48 PM | P | NR |
|
|
Nate Phone #: ###-####. Needs fire/life safety final.
|
BLD10-02874
| BLD-Final | 2/22/2011 | 2/22/2011 | 2/22/2011 4:54:11 PM | P | FAIL |
|
|
Nate Phone #: ###-####. Needs special inspection on anchor bolts for racks. Also needs fire finals.
|
BLD10-01234
| BLD-Framing/Rough-in | 2/22/2011 | 2/22/2011 | 2/22/2011 3:33:42 PM | P | PART |
|
|
herb Phone #: ###-####. Interior wood framed walls for restoom/lockeroom and breakroom. Pending plumbing rough in.
|
BLD11-00053
| BLD-Final | 2/22/2011 | 2/22/2011 | 2/22/2011 3:11:28 PM | P | CANC |
|
|
Ben Bird Phone #: ###-####
|
BLD11-00053
| BLD-Other | 2/22/2011 | 2/22/2011 | 2/22/2011 3:11:15 PM | P | PASS |
|
|
Ben Bird Phone #: ###-####. Ceiling grid ok.
|
BLD10-00987
| BLD-Framing/Rough-in | 2/22/2011 | 2/22/2011 | 2/22/2011 2:17:47 PM | P | PASS |
|
|
SCOTT Phone #: ###-####. Interior steel stud walls for interior stairs and fur out for welcome wall.
|
ESC11-00008
| Site Preparation | 2/22/2011 | 2/22/2011 | 2/22/2011 1:41:58 PM | P | PASS |
|
|
|
BLD10-02979
| BLD-Footing | 2/22/2011 | 2/22/2011 | 2/22/2011 1:41:38 PM | P | PASS |
|
|
ryan Phone #: ###-####
|
BLD10-01954
| DOC - Permit Expired | 2/22/2011 | 2/22/2011 | 2/22/2011 12:30:47 PM | A | PASS |
|
|
|
BLD10-01986
| DOC - Permit Expired | 2/22/2011 | 2/22/2011 | 2/22/2011 12:29:18 PM | A | PASS |
|
|
|
BLD11-00107
| BLD-Energy code compliance | 2/21/2011 | 2/22/2011 | 2/22/2011 11:09:17 AM | A | PASS |
|
|
the door code for the south door is 1530 and the lockbox is on the gas meter if the door is locked. The overhead garage door should also be open to just lift up. Thanks Phone #: ###-#### >> Inspection requested via web by chad emery. Energy inspection ok. Contractor has chosen to use 5/8 type x rock mon the lid, will need to provide draftstop at dwelling unit seperation.
|
BLD09-00962
| BLD-Final | 2/17/2011 | 2/22/2011 | 2/22/2011 10:48:12 AM | A | PASS |
|
|
curt - please call 1/2 hr prior so he can meet you there Phone #: ###-####. Ok for perm occ.
|
ESC10-00917
| Random Inspection | 2/22/2011 | 2/22/2011 | 2/22/2011 10:09:38 AM | A | PASS |
|
|
|
BLD10-02915
| BLD-Framing/Rough-in | 2/18/2011 | 2/22/2011 | 2/22/2011 10:07:15 AM | A | PASS |
|
|
Cameron Phone #: ###-####. All framing issues have been resolved. Also met with sheetrock contractor. All other fire issues with 1hr. ceiling have been discussed and will be inspected as job progresses.
|
BLD10-02915
| BLD-Energy code compliance | 2/22/2011 | 2/22/2011 | 2/22/2011 10:05:45 AM | A | PASS |
|
|
Cameron Phone #: ###-####
|
BLD11-00265
| BLD-Final | 2/18/2011 | 2/22/2011 | 2/22/2011 10:05:13 AM | A | CANC |
|
|
Cameron Phone #: ###-####
|
BLD11-00265
| BLD-Energy code compliance | 2/22/2011 | 2/22/2011 | 2/22/2011 10:04:59 AM | A | PASS |
|
|
Cameron Phone #: ###-####
|
BLD11-00265
| BLD-Framing/Rough-in | 2/22/2011 | 2/22/2011 | 2/22/2011 10:04:36 AM | A | PASS |
|
|
Cameron Phone #: ###-####. All framing issues have been corrected. Initial framing inspection notes were noted on permit BLD10-02915.
|