Inspections for the day of: Monday, February 22, 2016.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE11-02445 ELE-Aging Inspection2/22/20162/22/20162/23/2016 6:21:31 AM DONE
still under construction
ELE08-01084 ELE-Aging Inspection2/22/20162/22/20162/23/2016 6:19:47 AM DONE
still under construction
ELE15-03119 Conference2/22/20162/22/20162/22/2016 2:40:11 PMPDONE
talked about locations for new sub-panel in house
ELE14-00532 Final2/19/20162/22/20162/22/2016 2:11:48 PMPPASS
Ben ###-#### corrections made, ok final
ELE15-03858 Electrical Rough-In2/19/20162/22/20162/22/2016 1:11:37 PMPPASS
Ryan Barnes
Phone #: ###-#### Inspection requested via web by Kerri Hamilton ok cover u/g for rv pad west side
ELE15-03119 Conference2/22/20162/22/20162/22/2016 12:31:55 PMPPASS
Jay Phone #: ###-#### corrections made, ok final
ELE16-00051 Final2/18/20162/22/20162/22/2016 10:22:52 AMAPASS
Please contact Carol at ###-#### for access to home(they would like to know if you could come between 9-12, her husband is ill and they have a doctor appt. in the afternoon and it takes a little while for her to get him going for the day. If there are any electrical questions call Jamie Winters at ###-####. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by SUSAN MINICK ok final
ELE16-00153 Final2/19/20162/22/20162/22/2016 10:21:43 AMAPASS
12 solar panels.
AC micro-inverter system. No DC voltage.
Enphase M250 Micro-Inverters, that are CSA, IEEE-1547, and UL-1741 listed.
Ironridge Integrated Grounding System mid clamps, bonding straps and bonding lugs.
And 280 watt SolarWorld panels, ETL listed.

A single home run, in metal conduit, is ran from the array to the knife switch, located next to meter base. From the knife switch to the breaker in the main panel located in the garage, at the bottom of the bussing, opposite the feeder lugs. The solar breaker and knife switch are permanently marked for solar with weather proof labels, and the circuit numbers identified in the knife switch and on the panel schedule.

The inverters, panels and rails are all bonded with a number 6 ground that runs down to the service ground.

The main panel is in the garage, so give the homeowner a call for access at 208.344.4012


Thanks guys,
Ryan King
Phone #: ###-#### Inspection requested via web by Ryan King ok final
ELE15-03996 Electrical Rough-In2/19/20162/22/20162/22/2016 9:36:42 AMAPASS
Underground Inspection. Contact Pierre Elskamp Phone #: ###-#### Inspection requested via web by Cathy Duchek ok cover u/g for relocating lighting panel east of Bldg #51
ELE16-00446 Electrical Rough-In2/19/20162/22/20162/22/2016 8:25:41 AMAPASS
Ufer and a Underground cover. tom gilbert, ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce u/g towards transformer to within final 30' and concrete encased electrode ok cover
ELE16-00051 Final2/18/20162/22/20162/18/2016 1:16:58 PMPCANC
Please contact Carol at ###-#### for access to home. If there are any electrical questions call Jamie Winters at ###-####. Phone #: ###-#### >> Inspection requested via web by SUSAN MINICK Inspection cancelled from web by: SUSAN MINICK