Inspections for the day of: Monday, February 22, 2016.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE15-03332 Electrical Rough-In2/19/20162/22/20162/22/2016 2:21:11 PMPPASS
We need a rough-in for cover. Thank you Dale Phone #: ###-#### Inspection requested via web by Thomas Jenkins walls only ok cover
ELE15-00450 Electrical Rough-In2/19/20162/22/20162/22/2016 2:02:35 PMAPASS
Max Phone #: ###-#### ejector pump install ok
ELE16-00248 Final2/22/20162/22/20162/22/2016 1:27:00 PMPFAIL
Phone #: ###-#### Inspection requested via web by Gene Wright 300.15 (c) fitting required for FMC for physical protection
ELE16-00451 Final2/19/20162/22/20162/22/2016 12:52:39 PMAPART
power disconnect and reconnect is scheduled 4:11 o''clock AM after that would be best for a final Phone #: ###-#### Inspection requested via web by shane miller detached shop only ok, mudt verify grounded and grounding conductor seperated at house panel and a second ground rod driven
ELE13-01353 ELE-Aging Inspection2/22/20162/22/20162/22/2016 10:21:46 AM PASS
still under construction
ELE16-00511 Electrical Rough-In2/22/20162/22/20162/22/2016 9:54:51 AMPPASS
solar array install cover
ELE16-00503 Conference2/19/20162/22/20162/22/2016 9:53:48 AMADONE
Derik Phone #: ###-#### discussed wiring of hot tub and code requirements and install
ELE15-03729 Final2/19/20162/22/20162/22/2016 9:29:24 AMAPART
Partial Final for rooms 303,304,315,316,203,204,215,216,103,104,115,116 Phone #: ###-#### Inspection requested via web by Kerri Hamilton rooms 303,304,315,316,203,204,215,216,103,104,115,116 ok to occupy
ELE16-00511 Conference2/19/20162/22/20162/22/2016 9:26:13 AMADONE
Daryl DeGrange has requested an onsite meeting to discuss this install and its layout.
Please call twenty minutes before you head over, and we''ll notify Wright Brothers and EvenGreen''s electrician accordingly.
Thank you much Phone #: ###-#### Inspection requested via web by Ryan King discussed solar array installed verified listing and components
ELE16-00511 Final2/22/20162/22/20162/22/2016 9:05:58 AMPPASS
Daryl DeGrange has requested an onsite meeting to discuss this install and its layout.
Please call twenty minutes before you head over, and we''ll notify Wright Brothers and EvenGreen''s electrician accordingly.
Thank you much Phone #: ###-#### Inspection requested via web by Ryan King rough-in for solar array ok