BLD15-04168
| BLD-Card not on site to sign | 2/22/2016 | 2/22/2016 | 2/23/2016 6:47:06 AM | P | DONE |
|
|
call ahead for access Phone #: ###-####
|
BLD14-02389
| BLD-Conference | 2/22/2016 | 2/22/2016 | 2/23/2016 6:46:06 AM | P | DONE |
|
|
Request a on site conference with Dave H. to review some items with Bob Ledford on GBAD. Call Adam when available, ###-####. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
GCB15-00113
| GCB-Energy | 2/22/2016 | 2/22/2016 | 2/22/2016 3:11:52 PM | P | PASS |
|
|
Bill ###-####
|
GCB15-00064
| GCB-Final | 2/19/2016 | 2/22/2016 | 2/22/2016 2:41:05 PM | P | PASS |
|
|
Grey ###-#### - lockbox in back: 8223
|
BLD14-02173
| BLD-Framing/Rough-in | 2/19/2016 | 2/22/2016 | 2/22/2016 2:11:12 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD15-03005
| BLD-Wall Bracing | 2/22/2016 | 2/22/2016 | 2/22/2016 1:34:43 PM | P | PASS |
|
|
|
BLD15-03005
| BLD-Framing/Rough-in | 2/22/2016 | 2/22/2016 | 2/22/2016 1:33:59 PM | P | PART |
|
|
ok to insulate c/n on site
|
BLD15-02295
| BLD-Framing/Rough-in | 2/21/2016 | 2/22/2016 | 2/22/2016 1:33:04 PM | A | PASS |
|
|
Call Tim if any issues Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
|
BLD15-03005
| BLD-Conference | 2/18/2016 | 2/22/2016 | 2/22/2016 12:59:43 PM | A | DONE |
|
|
Framing Inspection. Call Steve Hanson with questions 850.8424. Plans on HVAC platform. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD15-01657
| BLD-Final | 2/18/2016 | 2/22/2016 | 2/22/2016 12:55:23 PM | A | CANC |
|
|
Rick Phone #: ###-####
|