ESC15-00606
| General Inspection | 2/19/2016 | 2/19/2016 | | | |
|
|
|
MIS16-00046
| BLD-Conference | 2/19/2016 | 2/19/2016 | | P | |
|
|
|
MIS16-00047
| BLD-Conference | 2/22/2016 | 2/22/2016 | 2/22/2016 3:49:43 PM | P | DONE |
|
|
Issued a correction notice to obtain a cert. of occupancy.
|
BLD15-04262
| BLD-Final | 2/22/2016 | 2/22/2016 | 2/22/2016 3:16:56 PM | P | CANC |
|
|
Reschduled for 2-23 in the pm.
|
BLD15-04030
| BLD-Footing | 2/19/2016 | 2/22/2016 | 2/22/2016 2:21:50 PM | P | PASS |
|
|
Cody Phone #: ###-####
|
BLD15-04262
| BLD-Final | 2/19/2016 | 2/22/2016 | 2/22/2016 1:57:01 PM | A | CANC |
|
|
Paula Phone #: ###-####
|
BLD14-03070
| BLD-Footing | 2/22/2016 | 2/22/2016 | 2/22/2016 1:32:15 PM | P | PASS |
|
|
Manuel Phone #: ###-####
|
MIS16-00046
| BLD-Conference | 2/19/2016 | 2/22/2016 | 2/22/2016 9:03:32 AM | A | DONE |
|
|
A correction notice notice was issued to obtain building permits (Needs to start process within 5 days) and all associated trade permits for the fermentation chambers that were constructed in the warehouse portion of the building. A follow up inspection has been scheduled for Feb 29th.
|