MEC17-00633
| Final | 2/21/2017 | 2/22/2017 | 2/22/2017 4:05:15 PM | P | PASS |
|
|
after 3pm-###-####
|
MEC17-00677
| Rough-in | 2/22/2017 | 2/22/2017 | 2/22/2017 2:20:26 PM | P | PASS |
|
|
Francis is on the job Inspection requested via web by Floyd Floyd Peek- R/I ok- range duct will be at final
|
MEC17-00677
| Pressure Test | 2/22/2017 | 2/22/2017 | 2/22/2017 2:15:17 PM | P | PASS |
|
|
Francis is on the job Inspection requested via web by Floyd Floyd Peek- 20lb gas pass- 5lb flue pass-
|
MEC17-00645
| Pressure Test | 2/21/2017 | 2/22/2017 | 2/22/2017 11:22:25 AM | A | PASS |
|
|
Please call Dave at ###-#### or Dan at ###-#### with a 30 minute heads up arrival time. Thank you. Phone #: ###-#### Inspection requested via web by David or K Cole- 60lb gas pass- 20lb gas pass- 5lb flue pass for W/H and Furnace
|
MEC17-00665
| Final | 2/21/2017 | 2/22/2017 | 2/22/2017 9:47:20 AM | A | PASS |
|
|
Final inspection on small remodel for first floor. Please contact Tom Andrews at ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau
|