FIR17-00723
| INSP-Final Inspection | 2/21/2018 | 2/22/2018 | 2/22/2018 2:07:50 PM | P | PASS |
|
|
Final commercial hood fire suppression system inspection complete.
|
FIR17-00724
| INSP-Final Inspection | 2/21/2018 | 2/22/2018 | 2/22/2018 2:07:36 PM | P | PASS |
|
|
Final commercial hood fire suppression system inspection complete.
|
FIR17-00267
| INSP-Sprinkler Rough-in | 2/22/2018 | 2/22/2018 | 2/22/2018 2:06:45 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping located in level 2, 3, and 4 linen/Ice sooms complete as well as added heads on west stairs landings complete, approved for cover.
|
FIR17-00041
| INSP-Final Inspection | 2/16/2018 | 2/22/2018 | 2/22/2018 10:33:57 AM | P | FAIL |
|
|
Observed on previous rough-in inspection for builing that annual inspection for fire sprinkler system has not been completed for a few years, annual inspection needs to be completed and tagged on fire sprinkler system before final inspection for this permit can be performed.
|
BLD15-03835
| FIRE-Final Inspection | 2/22/2018 | 2/22/2018 | 2/22/2018 10:26:24 AM | P | FAIL |
|
|
Provide as-builts for stairwell pressurization activation automatic function/manual function and overide, fire alarm permit will not be finaled until as-builts are submitted and approved.
|
FIR17-00047
| INSP-Final Inspection | 2/21/2018 | 2/22/2018 | 2/22/2018 10:17:54 AM | P | CANC |
|
|
Inspection request cancelled per conversation with Richard Clark Phone #: ###-####, request is rescheduled for 23FEB2018.
|
FIR17-00590
| INSP-Sprinkler Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 10:12:28 AM | A | CANC |
|
|
Please meet in the B.17C Lobby Phone #: ###-#### >> Inspection requested via web by John Wheeler Inspection cancelled from web by: John Wheeler
|
FIR17-00706
| INSP-Sprinkler Rough-in/Hydro | 2/22/2018 | 2/22/2018 | 2/22/2018 10:08:21 AM | P | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
|
FIR17-00610
| INSP-Sprinkler Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 10:07:15 AM | A | PASS |
|
|
Rough to ocver inspection for area of work complete.
|
FIR17-00706
| INSP-Supply line flush | 2/21/2018 | 2/22/2018 | 2/22/2018 5:29:07 AM | A | DONE |
|
|
Underground main line flush complete.
|