PLM96-03098
| INSP - Final | 2/18/1998 | 2/23/1998 | 2/23/1998 12:00:00 AM | A | PASS |
|
|
02/23/98 330 - Reinspect to see if the grouting work has been done.
|
PLM97-01930
| INSP - Final | 2/18/1998 | 2/23/1998 | 2/23/1998 12:00:00 AM | A | PASS |
|
|
02/23/98 330 - Final for sprinkler & backflow
|
PLM98-00443
| INSP - Final | 2/20/1998 | 2/23/1998 | 2/23/1998 12:00:00 AM | A | PASS |
|
|
02/23/98 330 - ###-#### pat
|
PLM98-00444
| INSP - Final | 2/20/1998 | 2/23/1998 | 2/23/1998 12:00:00 AM | A | PASS |
|
|
02/23/98 330 - sprinkler russ ###-####
|
PLM98-00451
| INSP - Plumbing Rough-in | 2/23/1998 | 2/23/1998 | 2/23/1998 12:00:00 AM | P | FAIL |
|
|
LAURELEE--###-#### tests failed, plumb vents thru roof to test, term. pex at metal piping prior to hb attachment
|
PLM97-03472
| INSP - Final | 2/20/1998 | 2/23/1998 | 2/23/1998 12:00:00 AM | P | FAIL |
|
|
david ###-#### vb on dw drain sprinkler permit
|
PLM97-04018
| INSP - Plumbing Rough-in | 2/23/1998 | 2/23/1998 | 2/23/1998 12:00:00 AM | P | PASS |
|
|
Scheduled by Hello!. Contact phone is [3224844]. ri ok with mid story stays on 3/4" risers
|
PLM97-01817
| INSP - Final | 2/23/1998 | 2/23/1998 | 2/23/1998 12:00:00 AM | P | PASS |
|
|
###-#### neil
|