BLD00-03353
| BLD-Framing/Rough-in | 2/21/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | A | PART |
|
|
###-####interior walls not part of the ,1 hr coridoo.r 2/23/2001 11:44:52 AM
|
BLD00-03645
| BLD-Other | 2/22/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:45:56. Contact: ###-####.east side of building ok grid. 2/23/2001 11:11:37 AM
|
BLD98-02583
| BLD-Foundation | 2/22/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | A | PART |
|
|
pouring elevator shaft ###-#### Dave Newman lower portion of elevator shaft cmu 12 foot lift poured with-out inspections,steel visible above block . 2/23/2001 12:18:28 PM
|
BLD00-03525
| BLD-Final | 2/22/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | A | PASS |
|
|
Walter ###-####ok perm oc by 425. 2/23/2001 11:46:28 AM
|
MEC00-03360
| Final | 2/22/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 13:55:39. Contact: ###-####.needs metal dryer vent. 2/23/2001 10:36:27 AM
|
BLD00-03590
| BLD-Final | 2/22/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-03381
| BLD-Footing | 2/23/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | P | PART |
|
|
BURT ###-#### -FT INSP
|
BLD01-00052
| BLD-Framing/Rough-in | 2/23/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | P | NR |
|
|
###-####c/n posted still need eng approval or add new hd. 2/23/2001 2:17:02 PM
|