BLD00-02964
| FIRE-Final Inspection | 2/21/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | A | FAIL |
|
|
Walter ###-#### need clarification on duct penetrations at 1 hr walls; need closures on all rated doors; overhead door requires smoke detectors for release 2/23/2001 9:44:12 AM
|
BLD00-02758
| FIRE-Final Inspection | 2/22/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | A | NR |
|
|
Scheduled by Inspector: 409 On 2/22/2001 9:13:39 AM contractor will reschedule 2/23/2001 8:52:05 AM
|
BLD00-03573
| FIRE-Final Inspection | 2/22/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 14:59:08. Contact: ###-####.
|
FIR00-00513
| INSP-Supply line flush | 2/23/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/23/2001 at 08:22:23. Contact: ###-####. hydro test okay on underground 2/23/2001 10:50:11 AM
|
BLD00-02398
| FIRE-Final Inspection | 2/20/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
FIR00-00604
| INSP-Final Inspection | 2/22/2001 | 2/23/2001 | 2/23/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 12:03:01. Contact: .
|
FIR00-00553
| INSP-Final Inspection | 2/22/2001 | 2/23/2001 | 2/22/2001 12:00:00 AM | A | CANC |
|
|
Jacob ###-####
|