FIR04-00037
| INSP-Final Inspection | 2/23/2004 | 2/23/2004 | 2/23/2004 12:00:00 AM | A | CANC |
|
|
rescheduled for tomorrow 2/23/2004 11:43:55 AM
|
FIR04-00037
| INSP-Sprinkler Rough-in/Hydro | 2/23/2004 | 2/23/2004 | 2/23/2004 12:00:00 AM | A | CANC |
|
|
duplicate inspection 2/23/2004 11:54:55 AM
|
FIR03-00692
| INSP-Sprinkler Rough-in/Hydro | 2/23/2004 | 2/23/2004 | 2/23/2004 12:00:00 AM | P | FAIL |
|
|
Anti-freeze valve must meet requirements of review note #24. Forward flush the backflow preventor. Provide flow switch with means for testing, valve supervision, and check valve for hose system. Resubmit plans per review notes
|
FIR03-00794
| INSP-Sprinkler Rough-in/Hydro | 2/23/2004 | 2/23/2004 | 2/23/2004 12:00:00 AM | P | PART |
|
|
Inspection is for the 24 hour air test. Pressure is at 41.5 psi 2/23/2004 4:19:18 PM
|
BLD02-00420
| FIRE-Final Inspection | 2/23/2004 | 2/23/2004 | 2/23/2004 12:00:00 AM | P | CANC |
|
|
ron ###-####
|
BLD02-00420
| FIRE-Alarm Testing | 2/23/2004 | 2/23/2004 | 2/23/2004 12:00:00 AM | P | CANC |
|
|
|
MIS04-00052
| FIR-Final | 2/23/2004 | 2/23/2004 | 2/23/2004 12:00:00 AM | P | PASS |
|
|
fire life safety finaled 2/23/2004 1:57:18 PM
|