FIR04-00760
| INSP-Final Inspection | 2/22/2005 | 2/23/2005 | 2/23/2005 12:00:00 AM | A | FAIL |
|
|
Replace the painted sprinkler heads 2/23/2005 10:50:00 AM
|
BLD04-02362
| FIRE-Final Inspection | 2/22/2005 | 2/23/2005 | 2/23/2005 12:00:00 AM | A | CANC |
|
|
Duplicate inspection. Finaled 2/22/2005 by 430 2/22/2005 12:41:14 PM
|
FIR04-00811
| INSP-Sprinkler Rough-in/Hydro | 2/22/2005 | 2/23/2005 | 2/23/2005 12:00:00 AM | P | PART |
|
|
basement hydro test passed. Could not do a rough-in inspection due to plans not matching installation. I spoke to Gerald at Treasure Valley about this. 2/23/2005 2:47:38 PM
|
FIR05-00037
| INSP-Sprinkler Rough-in/Hydro | 2/23/2005 | 2/23/2005 | 2/23/2005 12:00:00 AM | P | PART |
|
|
With Bill Alexander's permission the remodeled restroom fire sprinklers appear ok. Resubmittals will be required before final will be given. 2/24/2005 9:53:07 AM
|
FIR04-00666
| INSP-Sprinkler Rough-in/Hydro | 2/23/2005 | 2/23/2005 | 2/23/2005 12:00:00 AM | P | PART |
|
|
Second floor tenting is ok. Second floor piping is ok to cover. Rough-in on first floor center failed. Some upright heads need relocated. Brian will make adjustments. 2/23/2005 4:35:48 PM
|
FIR05-00078
| INSP-Final Inspection | 2/23/2005 | 2/23/2005 | 2/23/2005 12:00:00 AM | P | PART |
|
|
Sprinkler rough-in passed. Will final when all ceiling tile at heads is installed. 2/23/2005 2:50:45 PM
|