Inspections for the day of: Wednesday, February 23, 2005.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRon Ginner
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM05-00473 Final2/22/20052/23/20052/23/2005 12:00:00 AMAPASS
eddie or ###-#### ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ground work was installed by drake mech but was not permitted or inspected. ridgeway took the job over and i inspected the roughin and saw the ground work before it was covered.










d 2/23/2005 9:57:15 AM 2/23/2005 10:01:19 AM
PLM04-03750 Roof Drains2/23/20052/23/20052/23/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 2/23/2005 at 7:57:12 AM. Contact: ###-####. cleanout risors and gutter risors need to be sch 40 s 2/23/2005 2:02:13 PM dwv from one foot below grade to grade 2/23/2005 2:02:30 PM
PLM05-00249 Final2/23/20052/23/20052/23/2005 12:00:00 AMPPASS
Phone #: ###-####