Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03054 FIRE-Final Inspection2/23/20072/23/20072/23/2007 4:18:25 PMPCANC
Wrong job called in. No inspection performed.
BLD05-02719 FIRE-Final Inspection2/23/20072/23/20072/23/2007 4:17:10 PMPFAIL
No smoke barrier/draft curtain has been installed per the review comments and details on drawing sheets A4 to A6. All other life safety items ok.
FIR06-00499 INSP-Final Inspection2/23/20072/23/20072/23/2007 4:15:30 PMPPASS
Permit finaled
BLD05-01452 FIRE-Final Inspection2/22/20072/23/20072/23/2007 3:27:02 PMAFAIL
Need to test the smoke detectors that operate the fire/smoke doors and perform a complete inspection. Per Dan Stuart the occupancy will only be for the remodeled area. The remaining tenant area appears to be operating without an occupancy permit. I informed Mark in the fire department and he stated that he would follow up.
FIR05-00536 INSP-Sprinkler Rough-in2/22/20072/23/20072/23/2007 3:22:55 PMAPASS
9th floor sprinkler rough-in passed.
FIR07-00094 INSP-Sprinkler Rough-in/Hydro2/23/20072/23/20072/23/2007 11:34:23 AMAPASS
Sprinkler rough-in is passed. Insulation at the roof deck is falling on the piping/uprights and will need to be attached to the roof structur prior to a cover inspection being passed.
FIR07-00099 INSP-Sprinkler Rough-in2/22/20072/23/20072/23/2007 10:24:47 AMAPASS
Sprinkler piping is ok to cover.
FIR06-00600 INSP-Final Inspection2/22/20072/23/20072/23/2007 9:01:46 AMAPASS
permit finaled