Inspections for the day of: Wednesday, February 23, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-00110 BLD-Final2/23/20112/23/20112/23/2011 4:39:02 PMPPASS
Matt Phone #: ###-####. Will be ok for perm occ. once life/safety has finaled.
BLD10-02989 BLD-Framing/Rough-in2/23/20112/23/20112/23/2011 2:55:39 PMPPASS
additional structural support//Jon Phone #: ###-####. Visually inspected the structural upgrade work to the roof joist for additional rtu unit. All work was done per RFI from structural engineer of record.
ESC10-00917 Random Inspection2/23/20112/23/20112/23/2011 2:41:32 PMPPASS
BLD10-02915 BLD-Other2/23/20112/23/20112/23/2011 2:38:49 PMPPART
drywall nail inspection 1st layer//Cameron Phone #: ###-####. Base layer of 5/8 type x rock for 1hr. ceiling assembly.
BLD10-02040 BLD-Aging Inspection12/8/20102/23/20112/23/2011 12:54:10 PMACANC
BLD10-02040 DOC - Permit Expired2/23/20112/23/20112/23/2011 12:53:55 PMAPASS
ESC11-00008 Random Inspection2/23/20112/23/20112/23/2011 11:02:36 AMAPASS
BLD10-02979 BLD-Foundation2/22/20112/23/20112/23/2011 11:02:18 AMAPASS
Wesley Phone #: ###-####
BLD11-00022 BLD-Final2/22/20112/23/20112/23/2011 10:15:57 AMAPASS
First thing A.M.----Craig Phone #: ###-####. ok for perm occ.
BLD11-00107 BLD-Energy code compliance2/22/20112/23/20112/23/2011 10:01:04 AMAPASS
chad Phone #: ###-####. Inspected the draft stop installation at dwelling unit seperation.
GCB10-00085 GCB-Framing2/22/20112/23/20112/23/2011 9:38:24 AMAFAIL
FramingKelly @ ###-####. Provide approved plans with all notes. Repair 2x6 top plate at bearing wall and fire block hole. Additional straps required at portal frame at garage. Fireblock area above fireplace were fire could pass horizontally into attic. correction notice posted. ok to insulate.