FIR13-00218
| FIR-Aging Inspection | 2/23/2016 | 2/23/2016 | 2/26/2016 1:56:47 PM | | NR |
|
|
Jeff is following up
|
FIR16-00032
| INSP-Sprinkler Rough-in/Hydro | 2/23/2016 | 2/23/2016 | 2/23/2016 3:17:25 PM | P | PASS |
|
|
Inspection was to verify the two dry sidewalls installed at the top of the exhaust duct
|
BLD14-02438
| FIRE-Final Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 3:12:07 PM | P | FAIL |
|
|
Relocate the fire extinguisher as discussed and per plan review an updated fire sprinkler analysis is required for the racking permit.
|
BLD15-02572
| FIRE-Final Inspection | 2/22/2016 | 2/23/2016 | 2/23/2016 2:40:38 PM | P | PASS |
|
|
Life safety passed
|
FIR16-00020
| INSP-Final Inspection | 2/19/2016 | 2/23/2016 | 2/23/2016 2:20:17 PM | P | FAIL |
|
|
Provide plan modifications and correct recall function as discussed. Need to test heat detectors as well.
|
FIR16-00005
| INSP-Final Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 12:59:03 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00104
| INSP-Sprinkler Rough-in | 2/23/2016 | 2/23/2016 | 2/23/2016 11:45:26 AM | P | CANC |
|
|
Concrete is being delivered at 3pm. Please schedule inspection with Bryan. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR16-00082
| INSP-Final Inspection | 2/22/2016 | 2/23/2016 | 2/23/2016 9:01:59 AM | A | FAIL |
|
|
Strobes are not 15cd and the back boxes are not weather proof as per the approved plans. No testing performed.
|
FIR16-00076
| INSP-Sprinkler Rough-in | 2/22/2016 | 2/23/2016 | 2/23/2016 8:48:29 AM | A | PASS |
|
|
Piping above lay in tile is ok to cover.
|
FIR16-00048
| INSP-Sprinkler Rough-in/Hydro | 2/22/2016 | 2/23/2016 | 2/22/2016 2:38:55 PM | P | CANC |
|
|
As late as possible Phone #: 2089411846 >> Inspection requested via mobile web by Talk w/ Jim for after 4pm Inspection cancelled via mobile web on Monday, February 22, 2016.
|