ELE17-03700
| Final | 2/22/2018 | 2/23/2018 | 2/23/2018 2:08:12 PM | A | PASS |
|
|
Ok final. Control panel for fountains is GFI protected. #6 EQ ring installed 4 to 5" down in a 6' diameter pattern,
|
ELE18-00101
| Final | 2/23/2018 | 2/23/2018 | 2/23/2018 1:58:24 PM | P | PASS |
|
|
Dan ###-#### Inspection requested via web by Dan Hobdey Ok final.
|
ELE18-00032
| Electrical Rough-In | 2/23/2018 | 2/23/2018 | 2/23/2018 1:20:55 PM | P | PASS |
|
|
Pls contact Bryce (Foreman) @ ###-#### or Barry (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes Ok cover. All items UL listed.
|
ELE18-00706
| Electrical Rough-In | 2/23/2018 | 2/23/2018 | 2/23/2018 1:13:56 PM | P | PASS |
|
|
shed in back on right. Any questions call steve 2088705561 Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover. Sub panel, grds and neut seperated.
|
ELE18-00462
| Final | 2/23/2018 | 2/23/2018 | 2/23/2018 12:52:26 PM | P | PASS |
|
|
** REQUEST ** Pls contact Liz Anderson (homeowner) one hr prior to arrival @ ###-####. For any questions, pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-####. Thank you. Inspection requested via web by Rob Maes Ok final.
|
ELE18-00505
| Final | 2/21/2018 | 2/23/2018 | 2/23/2018 12:48:23 PM | A | CANC |
|
|
Solar Array final Phone #: ###-#### Inspection requested via web by Paula Gietzen I will contact electrical contractor to brace overhead mast, and to also install another mast of some sort on W side of garage to achieve 36" requirement for clearance from rooftop.
|
ELE18-00704
| Temporary Service | 2/23/2018 | 2/23/2018 | 2/23/2018 11:24:08 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown t/s u/g n ok.
|
ELE18-00130
| Electrical Rough-In | 2/23/2018 | 2/23/2018 | 2/23/2018 9:56:12 AM | A | PASS |
|
|
Late morning would be best since we need to come into town and give you access to the building! Call me if you could in advance, Thx. Steve ###-#### Phone #: ###-#### Inspection requested via web by Steven Meredith Ok cover. Talked with contractor and discussed possible load calc needed.
|
ELE18-00658
| Temporary Service | 2/22/2018 | 2/23/2018 | 2/23/2018 9:55:17 AM | A | PASS |
|
|
please contact electrician Shawn with any questions @ ###-#### Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON t/s o/h n ok
|
ELE18-00176
| Final | 2/22/2018 | 2/23/2018 | 2/23/2018 9:04:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by shane miller Ok final garage, work out rm, and new addition to back of house.
|
ELE13-02781
| ELE-Aging Inspection | 2/23/2018 | 2/23/2018 | 2/23/2018 7:38:08 AM | | DONE |
|
|
Please coordinate with homeowner and schedule a final inspection.
|
ELE13-01051
| ELE-Aging Inspection | 2/23/2018 | 2/23/2018 | 2/23/2018 7:37:12 AM | | DONE |
|
|
Please schedule for a final inspection.
|