FIR02-00515
| INSP-Alarm Testing | 2/21/2003 | 2/24/2003 | 2/24/2003 12:00:00 AM | A | PART |
|
|
###-####- or cell ###-####-- mike temp occ approved per Dave Miller; need notification in walkways on 2 and 3 floor and 1st floor lobby; need alaternate floor recall for elevator; need update maps and device descriptors; 2/24/2003 10:18:11 AM
|
FIR02-00451
| INSP-Final Inspection | 2/24/2003 | 2/24/2003 | 2/24/2003 12:00:00 AM | A | PASS |
|
|
|
BLD02-01532
| FIRE-Final Inspection | 2/24/2003 | 2/24/2003 | 2/24/2003 12:00:00 AM | A | PART |
|
|
per Dave Miller temp occ is approved pending resolution of getting the elevator machine room fire sprinklered; alternate floor recall for elevator; notification devices in walkways and lobby; updated map at FACP 2/24/2003 1:26:02 PM
|
FIR02-00228
| INSP-Final Inspection | 2/21/2003 | 2/24/2003 | 2/24/2003 12:00:00 AM | A | NR |
|
|
Grant Ahten; Phone #: ###-#### Internet Inspection Request from: Terry Owsley per phone call from Rob this inspection won't be ready as they have determined that sprinkler control valves aren't supervised by the alarm panel; he will call when ready 2/24/2003 1:23:52 PM
|
BLD00-02893
| FIRE-Final Inspection | 2/21/2003 | 2/24/2003 | 2/24/2003 12:00:00 AM | P | FAIL |
|
|
###-#### lynn told Lynn that we need to have city approved plans 2/24/2003 2:29:35 PM
|
FIR02-00323
| INSP-Final Inspection | 2/24/2003 | 2/24/2003 | 2/24/2003 12:00:00 AM | P | FAIL |
|
|
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need knox box; map for all initiating devices; NAC's not working; secondary phone line not reporting trouble; need horn/strobe in conference room 2/24/2003 4:13:07 PM
|
FIR02-00044
| INSP-Final Inspection | 2/24/2003 | 2/24/2003 | 2/24/2003 12:00:00 AM | P | PASS |
|
|
per agreement with Dave Miller and BFD the freight elevator is not required to have elevator recall 2/24/2003 1:21:15 PM
|