Inspections for the day of: Thursday, February 24, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorLane Manuel
TitleSTRUCTURAL INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-02956 BLD-Foundation2/23/20052/24/20052/24/2005 12:00:00 AMAPASS
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
stemwalls, and electrode ok. #4 rebar 2/24/2005 9:48:11 AM
BLD04-01048 BLD-Wall cover2/23/20052/24/20052/24/2005 12:00:00 AMAPART
Wall cover on Second Floor Only; Phone #: ###-#### Internet Inspection Request from: Robbie Miller
energy insp. ok. R-19 walls 2/24/2005 9:14:16 AM
BLD05-00321 BLD-Foundation2/24/20052/24/20052/24/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/24/2005 at 6:47:11 AM. Contact: ###-####.
BLD05-00323 BLD-Foundation2/24/20052/24/20052/24/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/24/2005 at 6:49:00 AM. Contact: ###-####.
MEC05-00585 Pressure Test2/24/20052/24/20052/24/2005 12:00:00 AMPPART
###-####...bj......past golden wheel..1st right..building with no siding 2/24/2005 9:48:03 AM
piping for units 3,5,6,7,13,20 failed.
Allother units ok/tagged. 2/24/2005 3:07:43 PM
MEC05-00623 Rough-in2/24/20052/24/20052/24/2005 12:00:00 AMPPASS
rob ###-####
23 psi 2/24/2005 2:21:38 PM
MEC05-00623 Pressure Test2/24/20052/24/20052/24/2005 12:00:00 AMPPASS
rob ###-####
BLD05-00170 BLD-Footing2/24/20052/24/20052/24/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 2/24/2005 at 10:42:31 AM. Contact: ###-####.
footings ok 2/24/2005 4:01:59 PM
BLD05-00159 BLD-Footing2/24/20052/24/20052/24/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 2/24/2005 at 10:44:00 AM. Contact: ###-####.
2/24/2005 3:06:28 PM
footings ok 2/24/2005 4:01:40 PM