BLD04-02956
| BLD-Foundation | 2/23/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | A | PASS |
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
stemwalls, and electrode ok. #4 rebar 2/24/2005 9:48:11 AM
|
BLD04-01048
| BLD-Wall cover | 2/23/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | A | PART |
|
|
Wall cover on Second Floor Only; Phone #: ###-#### Internet Inspection Request from: Robbie Miller
energy insp. ok. R-19 walls 2/24/2005 9:14:16 AM
|
BLD05-00321
| BLD-Foundation | 2/24/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 6:47:11 AM. Contact: ###-####.
|
BLD05-00323
| BLD-Foundation | 2/24/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 6:49:00 AM. Contact: ###-####.
|
MEC05-00585
| Pressure Test | 2/24/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | P | PART |
|
|
###-####...bj......past golden wheel..1st right..building with no siding 2/24/2005 9:48:03 AM
piping for units 3,5,6,7,13,20 failed.
Allother units ok/tagged. 2/24/2005 3:07:43 PM
|
MEC05-00623
| Rough-in | 2/24/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | P | PASS |
|
|
rob ###-####
23 psi 2/24/2005 2:21:38 PM
|
MEC05-00623
| Pressure Test | 2/24/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | P | PASS |
|
|
rob ###-####
|
BLD05-00170
| BLD-Footing | 2/24/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 10:42:31 AM. Contact: ###-####.
footings ok 2/24/2005 4:01:59 PM
|
BLD05-00159
| BLD-Footing | 2/24/2005 | 2/24/2005 | 2/24/2005 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 2/24/2005 at 10:44:00 AM. Contact: ###-####.
2/24/2005 3:06:28 PM
footings ok 2/24/2005 4:01:40 PM
|