BLD05-02621
| BLD-Footing | 2/24/2006 | 2/24/2006 | 2/27/2006 7:54:28 AM | P | PART |
|
|
Dane; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. perimeter footing for detached shop.
|
BLD06-00266
| BLD-Framing/Rough-in | 2/24/2006 | 2/24/2006 | 2/27/2006 7:53:55 AM | P | PART |
|
|
Matt ###-#### -- for stem walls. stemwall insp.
|
BLD06-00140
| BLD-Final | 2/23/2006 | 2/24/2006 | 2/24/2006 2:14:15 PM | P | PASS |
|
|
cathy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD05-02072
| BLD-Energy code compliance | 2/23/2006 | 2/24/2006 | 2/24/2006 1:50:09 PM | P | PASS |
|
|
Internet Inspection Request from: Carey Allen. All framing issues have been resolved.
|
BLD05-01422
| BLD-Framing/Rough-in | 2/24/2006 | 2/24/2006 | 2/24/2006 1:20:12 PM | P | NR |
|
|
Anthony; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs mech. ri insp.
|
BLD05-01972
| BLD-Framing/Rough-in | 2/24/2006 | 2/24/2006 | 2/24/2006 12:04:59 PM | P | FAIL |
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Need requested paperwork. c/n posted.
|
BLD05-02394
| BLD-Foundation | 2/24/2006 | 2/24/2006 | 2/24/2006 11:55:16 AM | P | PART |
|
|
re-bar and masonary grout insp//grouting at 1pm//tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. West wall, top of wall. Also reveiwed special inspection reports.
|
BLD05-03113
| BLD-Framing/Rough-in | 2/24/2006 | 2/24/2006 | 2/24/2006 11:32:40 AM | P | PASS |
|
|
Troy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs lateral bracing on T27 truss.
|
BLD05-02694
| BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 10:49:00 AM | A | PART |
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-02692
| BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 10:48:47 AM | A | PART |
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-02690
| BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 10:48:33 AM | A | PART |
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-02686
| BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 10:48:24 AM | A | PART |
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-02301
| BLD-Framing/Rough-in | 2/23/2006 | 2/24/2006 | 2/24/2006 10:47:10 AM | A | PART |
|
|
andy Note: shear; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Shear nailing on seperation wall inner layer.
|
BLD05-03011
| BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 10:07:57 AM | A | PART |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Wip. Verts being tied in place while on site.
|
BLD05-02598
| BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 9:55:29 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 2/23/2006 at 12:40:20 PM. Contact: ###-####. no plans, no one on site.
|
BLD05-02918
| BLD-Framing/Rough-in | 2/23/2006 | 2/24/2006 | 2/24/2006 9:49:41 AM | A | PASS |
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All framing issues have been resolved.
|
BLD06-00362
| BLD-Final | 2/23/2006 | 2/24/2006 | 2/24/2006 9:32:12 AM | A | PASS |
|
|
will leave the plans w/the cashier in the back///chuck; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-03395
| BLD-Final | 2/23/2006 | 2/24/2006 | 2/24/2006 9:20:13 AM | A | PASS |
|
|
robie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. ok for perm occ.
|
BLD05-02922
| BLD-Final | 2/23/2006 | 2/24/2006 | 2/24/2006 9:07:44 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/23/2006 at 4:44:18 PM. Contact: ###-####. Window by back door needs to be safetyglazed.
|
BLD05-02918
| BLD-Energy code compliance | 2/24/2006 | 2/24/2006 | 2/24/2006 12:00:00 AM | A | PASS |
|
|
|