ESC08-00871
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 3:52:28 PM | P | PASS |
|
|
|
BLD08-02182
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 3:52:11 PM | P | NR |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
ESC08-00872
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 3:51:49 PM | P | PASS |
|
|
|
BLD08-02183
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 3:51:18 PM | P | NR |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
ESC08-00873
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 3:50:59 PM | P | PASS |
|
|
|
BLD08-02184
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 3:50:40 PM | P | NR |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
ESC08-00874
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 3:50:21 PM | P | PASS |
|
|
|
BLD08-02185
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 3:50:02 PM | P | NR |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD08-02187
| BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 3:46:37 PM | P | PASS |
|
|
1st. floor, 1st layer of 5/8 type x rock, remaining side for 2hr. fire wall.
|
BLD08-02186
| BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 3:44:06 PM | P | PASS |
|
|
1st. floor, 1st. layer, remaining side of 5/8 type x rock for 2hr. wall.
|
BLD08-02204
| BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 3:42:14 PM | P | PASS |
|
|
2nd. floor, 2nd layer of 5/8 type x rock for 2hr. wall.
|
BLD08-02201
| BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 3:40:48 PM | P | PASS |
|
|
2nd. floor, 1st. layer of 5/8 type x rock, remaining side for 2hr. fire wall.
|
ESC08-00933
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 3:09:02 PM | P | FAIL |
|
|
Needs to post ESC permit signs at controlled enterance. Also remove existing top dressing, provide new filter fabric and top dressing. Verbal c/n was given to RP. Will reinspect on THursaday.
|
BLD09-00152
| BLD-Final | 2/23/2009 | 2/24/2009 | 2/24/2009 12:10:02 PM | A | PASS |
|
|
John Phone #: ###-#### Please call 1/2 hr
|
BLD09-00152
| DOC - Permit Finaled | 2/24/2009 | 2/24/2009 | 2/24/2009 12:09:54 PM | P | PASS |
|
|
|
ESC08-00951
| Site Final | 2/24/2009 | 2/24/2009 | 2/24/2009 10:18:57 AM | A | PASS |
|
|
|
ESC08-00951
| DOC - Permit Finaled | 2/24/2009 | 2/24/2009 | 2/24/2009 10:18:50 AM | P | PASS |
|
|
All BMP's and ESC sign have been removed. All denuded soils have been revegatated. o for final.
|
BLD08-02324
| BLD-Final | 2/23/2009 | 2/24/2009 | 2/24/2009 10:17:50 AM | A | PASS |
|
|
tim - please call 1/2 prior for access Phone #: ###-####
|
BLD08-02324
| DOC - Permit Finaled | 2/24/2009 | 2/24/2009 | 2/24/2009 10:17:43 AM | P | PASS |
|
|
Letter of compliance was issued.
|
ESC08-00895
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 9:57:15 AM | A | PASS |
|
|
|
ESC08-00896
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 9:57:02 AM | A | PASS |
|
|
|
ESC08-00897
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 9:56:50 AM | A | PASS |
|
|
|
ESC08-00898
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 9:56:36 AM | A | PASS |
|
|
|
BLD08-02204
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 9:56:20 AM | A | NR |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD08-02203
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 9:54:28 AM | A | CANC |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD08-02202
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 9:53:44 AM | A | CANC |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD08-02201
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 9:52:32 AM | A | NR |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD08-02187
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 9:45:15 AM | A | NR |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD08-02188
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 9:44:10 AM | A | CANC |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
BLD08-02189
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 9:43:38 AM | A | CANC |
|
|
Jim This inspection is for the fire wall Phone #: ###-####
|
ESC08-00875
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 9:41:20 AM | A | PASS |
|
|
|
ESC08-00877
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 9:41:03 AM | A | PASS |
|
|
|
ESC08-00878
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 9:40:33 AM | A | PASS |
|
|
|
ESC08-00879
| Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 9:40:16 AM | A | PASS |
|
|
|
BLD08-02186
| BLD-Framing/Rough-in | 2/23/2009 | 2/24/2009 | 2/24/2009 9:39:22 AM | A | PART |
|
|
Jim This inspection is for the fire wall Phone #: ###-####. 1st. floor, 1st. layer 5/8 type x rock for 2hr. wall, one side only.
|