Inspections for the day of: Wednesday, February 24, 2010.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00708 INSP-Sprinkler Rough-in/Hydro2/23/20102/24/20102/24/2010 3:50:35 PMPPASS
The 24 hour air test on the last dry system passed.
BLD09-00077 FIRE-Final Inspection2/24/20102/24/20102/24/2010 2:30:55 PMPPART
A temporary occupancy was given with Scott's permission until the privacy curtains have been installed and it is verified that they meet NFPA 13 requirements for obstructions.
FIR09-00494 INSP-Final Inspection2/23/20102/24/20102/24/2010 2:20:53 PMAPASS
Permit finaled. Forward flush passed.
BLD09-02109 FIRE-Final Inspection2/24/20102/24/20102/24/2010 1:59:50 PMPPASS
Life safety passed
FIR10-00031 INSP-Final Inspection2/23/20102/24/20102/24/2010 11:46:08 AMAPASS
Permit finaled. The extended coverage pendants have been moved to more than 8' apart.